收藏 分享(赏)

实习报告范文英语版.docx

上传人:微传9988 文档编号:1988565 上传时间:2018-08-30 格式:DOCX 页数:6 大小:14.10KB
下载 相关 举报
实习报告范文英语版.docx_第1页
第1页 / 共6页
实习报告范文英语版.docx_第2页
第2页 / 共6页
实习报告范文英语版.docx_第3页
第3页 / 共6页
实习报告范文英语版.docx_第4页
第4页 / 共6页
实习报告范文英语版.docx_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、实习报告范文英语版实习是我们脱离大学之前的一次珍贵演习,正确地认识自己。以下是小编为大家整理的实习报告范文英语版。范文一Graduation reportGraduation practice is to complete the final phase of the universitys course to be the most important section of the Practice. Practice is every qualified students must havean experience that allows us to enhance profession

2、alism in the practice of awarenessand practice of awareness. We practice during the process of training units in theschool and support, more guidance of experts, through training we learned a lot in class, not simply the knowledge of school for our future design and lay a solid foundation. At the sa

3、me time allow themselves to contact the school for the purpose ofinternship training of our ability, the fiveweek internship to increase their ability to havea lot of knowledge, greatly improved.Graduation purposeInternship is designed to improve the ability of students and social contacts and to un

4、derstand and master, verify and consolidate learned basic course content. Enable students to understand the modern highrise building design and the actual construction of electrical easy to ignore the problem, students integrate theory with practice, love the professional, enthusiastic, committed to

5、 thinking of Chinas modernization drive.Graduation contentTo achieve the above objective practice, practice the main content should include:1. Understand the internship process and production organization of productionmanagement.2. Understand the performance of some electrical products and features.

6、3. Control lowvoltage distribution system design, weak part of the design, lighting,part of the design, dynamic part of the design, lightning protection and grounding part of the design.4. Institute of electrical equipment used in operating methods and the basic working principle.Although this pract

7、ice is only 3 weeks time, but during that time, the theory for somecommon things, with perceptual awareness, feel benefit.Here are some of my summary of the internship period, and their feelings and experiences. To carry out their work in the future, and the future work of great help tome.Visit the

8、West Campus, Dongsheng Building and City Hall and linear lowvoltagepower distribution room, and the laying of the roof there are weaknesses in the design of some of mine. Now I will explain in detail the building of the lightning protection and grounding1. Basic principles:Lightning protection desig

9、n of technical measures should be the existing national standard “lightning protection design of buildings“ for Lightning Protection, refer to “Building Lightning Protection Design Standard“ corresponding requirements, the use of ball lightning rod protection method, the use of other potential join

10、the most important safety measures.2. Anticloudtomeasure, should meet the following requirements:(1) air terminals using the lightning rod, lightning protection zone (network), or a combination of both, it should be used as a metal roof building air terminals, but should be consistent with regulator

11、y requirements. Containing radioactive material should not be used air terminals. The elimination of other forms of lightning, it should only be used with high pole tower roof was added to our building on. Protrusions on the roof, such as satellite and receiver antenna, holiday lights, aviation obst

12、ruction lights and aircooled unit, the roof should be in the range of lightning protection devices, if not calculated by ball within the scope of protection should be separate lightning rod, with protection, lightning protection device connected with the roof.(2) deflectors should give priority to t

13、he use of reinforced concrete building columns or shear walls in the main bar, but also should use the building on fire ladders, steel columns, metal chimneys, etc., as deflectors.When the use of steel in reinforced concrete columns, steel columns as a natural drop, and also used as a grounding devi

14、ce based steel with no disconnect card, but it should be located in a number of suitable locations outside the bar connected with the column connecting plate, for the measurement, an external artificial grounding and equipotential bonding for use.Brick buildings surrounded by a separate deflectors i

15、n the external walls and the installation of meters from the ground disconnected card. The meters to meters underground for some protective measures should be taken.(3) The use of grounding devices should give priority to the building of reinforced concrete base. A reinforced concrete ground beam, should in the beam reinforced with a ring grounding device; not reinforced concrete ground beam, it can not in the building surrounding strip of reinforced concrete base closed, galvanized flat steel with a direct lay40x4 pit in the outer groove to form a circular grounding.1/3123 下一页尾页

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 实用文档 > 调研文书

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:道客多多官方知乎号:道客多多

经营许可证编号: 粤ICP备2021046453号世界地图

道客多多©版权所有2020-2025营业执照举报