收藏 分享(赏)

软件工程毕业英语ppt文档.ppt

上传人:scg750829 文档编号:7907188 上传时间:2019-05-29 格式:PPT 页数:12 大小:514.50KB
下载 相关 举报
软件工程毕业英语ppt文档.ppt_第1页
第1页 / 共12页
软件工程毕业英语ppt文档.ppt_第2页
第2页 / 共12页
软件工程毕业英语ppt文档.ppt_第3页
第3页 / 共12页
软件工程毕业英语ppt文档.ppt_第4页
第4页 / 共12页
软件工程毕业英语ppt文档.ppt_第5页
第5页 / 共12页
点击查看更多>>
资源描述

1、The Design and Implementation of Business Development Management System,Author: Kevin Class: 073 Instructor: Mrs.Hao,2,|,The Design and Implementation of Business Development Management System,Abstract,This thesis describes a system designed to provide more convenience for companys living, learning

2、and working for information needs. It designs and implements information display, information inquiry, information dissemination, information delete and information auditing modules.,Technology,The system adopts Struts 2.0 framework which is based on MVC mode and with JSP technology for the front pa

3、ge editing, and uses JavaBean to encapsulate the service data.,3,|,The Design and Implementation of Business Development Management System,Theories and Methods,Framework1. Some frameworks have been linked to a proprietary development environment. 2. You can use any development environment with Strut

4、s:Visual Age for Java, Eclipse are all popular choices among Struts developers. If you can use it with Java, you can use it with Struts.,Theories and Methods,Java Server PagesTo be seen as a JSP page, the file just needs to be saved with an extension of .jsp. When a client requests the JSP page, the

5、 container translates the page into a source code file for a Java servlet and compiles the source into a Java class fileJavaBeansJavaBeans is a reusable software component written in Java. To qualify as a JavaBeans, the class must be concrete and public, and have a no argument constructor.,4,|,The D

6、esign and Implementation of Business Development Management System,5,|,The Design and Implementation of Business Development Management System,Procedures Description,The Meaning of Business Management SystemAt present, from a worldwide view, the successful application of enterprise products business

7、 development management system, mostly have been in developed countries, especially the United States and Europe.establishing and improving the platform of the supply and demand information to strengthen the supply and demand information and data technology, and the supply and dhemand information an

8、d data standardization.,6,|,The Design and Implementation of Business Development Management System,System Models and Features,3) The Project Management Module,2) Demands Management and Statistics Model,1) Business Requirements Management Model,7,|,The Design and Implementation of Business Developme

9、nt Management System,Three Parts,1) Business Requirements Management Model Various departments can put forward the demand information (demand information can be demand for new products and the new demands on existing products and through the sales quotation to put forward new requirements), submitte

10、d those kinds of demands to the department managers by creating a new model (department managers will put forward the new demand to the products department directly).,8,|,The Design and Implementation of Business Development Management System,Three Parts,2) Demands Management and Statistics Model,9,

11、|,The Design and Implementation of Business Development Management System,Three Parts,3) The Project Management ModuleSelect the information of the demand to confirm whether to proceed with the project. After filling description about the project, the Products Division can configure role (or more) t

12、o approval the demand, and the role for the final approval. After all roles gave the approval, The Products Division will decide whether produce the project or not. For the approval that canceled, the role that has the authority must fill in the reason to explain why he cancels the project, and then

13、 end the project process. If the final Appeal of project can be agreed, the project will enter the process of product development.,10,|,The Design and Implementation of Business Development Management System,Test Results,The test will mainly focus on white-box testing, and assisted with black-box te

14、sting.White-box testing is also called structure testing or logical-driven testing. It is executed by testing the internal operation and each code whether they accord the expected rules or not.Black-box testing is like a closed box. You can see only the outside of the box. The tester doesnt care abo

15、ut the program codes, but check whether the function of the system according to the customers requirement.,11,|,The Design and Implementation of Business Development Management System,Test Results,12,|,The Design and Implementation of Business Development Management System,END,Thank YouBefore my lea

16、ving, I still have a lot of words to say to the persons who helped me. I know deeply in my heart that without teachers five years education in the class I wouldnt own the ability to write a paper, I know without my classmates support and help I wouldnt finish my paper so smoothly, and I know family do contribute a lot to my study. I want to say thank you.,

展开阅读全文
相关资源
猜你喜欢
相关搜索
资源标签

当前位置:首页 > 企业管理 > 管理学资料

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:道客多多官方知乎号:道客多多

经营许可证编号: 粤ICP备2021046453号世界地图

道客多多©版权所有2020-2025营业执照举报