收藏 分享(赏)

宁波市污水处理COD考核办法.doc

上传人:weiwoduzun 文档编号:1896556 上传时间:2018-08-29 格式:DOC 页数:15 大小:146.50KB
下载 相关 举报
宁波市污水处理COD考核办法.doc_第1页
第1页 / 共15页
宁波市污水处理COD考核办法.doc_第2页
第2页 / 共15页
宁波市污水处理COD考核办法.doc_第3页
第3页 / 共15页
宁波市污水处理COD考核办法.doc_第4页
第4页 / 共15页
宁波市污水处理COD考核办法.doc_第5页
第5页 / 共15页
点击查看更多>>
资源描述

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important “River pig“ resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is hi

21、gh. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million,

22、about 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predict

23、ed that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .4.1 application of the Chinese language application for proxy bidding

24、 agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified locat

25、ion. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the

26、 agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charg

27、es in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to biddin

28、g agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts fo

29、r the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tenderi

30、ng agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the

31、following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with th

32、e General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit

33、not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. C

34、omparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded

35、 in the order. 5th chapter application format notes: bidding agent .宁波市污水处理 COD(化学需氧量)减排工作考核办法(试行)第一条 为进一步推进我市环境保护和节能减排工作,切实加强污水处理设施建设和运行的监管,落实省建设厅下达我市的 COD(化学需氧量)减排年度目标任务,根据省建设厅关于印发浙江省建设系统 COD(化学需氧量)减排工作考核办法(试行)的通知(浙建城200824 号),以及市政府节能减排目标责任有关要求,制订本办法。第二条 本办法所称的“COD 减排考核”是指对全市污水处理设施运行情况及各地完成 COD 减排

36、任务的考核。污水处理设施是指集中式污水处理厂(站)(以下简称“污水处理厂”)、污水管网、泵站、再生水利用、污泥处置等相关设施。第三条 各县(市)建设局、镇海区建设和交通局、北仑区城市管理局、大榭开发区规划建设局是各地年度 COD 减排工作的责任主体(以下简称“责任主体”),直接对本辖区污水处理设施 COD 减排工作负责。市城市排水有限公司是市本级 COD 减排工作的实施主体。市排水管理处负责牵头起草年度 COD 减排目标任务,日常报表材料的汇总上报,并具体负责 COD 减排工作的年度考核。第四条 各责任主体和和市城市排水有限公司负责分解落实目标任务,监督管理污水处理设施运行。指定专人负责 CO

37、D 减排工作,按时汇总、上报本辖区污水处理厂运行情况报表资料,并建立相应的台帐和档案。第五条 COD 减排考核内容:(一)减排工作推动情况。包括领导重视、计划编制、任务分解、措施落实、检查考核等。(二)减排指标完成情况。1、COD 去除量。指通过污水处理厂年实际去除 COD 总量。目标确定以各污水处理厂上年实际去除量为基数,根据上年COD 进出水浓度和污水厂下年需达到的运行负荷率为依据,结合省厅下达的 COD 去除量年度目标要求,确定各污水处理厂 COD 去除量本年度任务。2、运行负荷率。指污水处理厂实际平均日处理水量/建成设计规模。根据国家和省政府有关规定,新建污水处理厂投入运行满一年,年实

38、际污水处理量要确保不低于设计能力的 60%;投入运行 3 年以上的,年实际污水处理量确保不低于设计能力的75%。以上年污水处理厂年平均运行负荷率为基础,提出下年度目标。3、污水处理率。指污水年处理量/污水年实际排放量。根据国家和省政府有关规定,到 2010 年,市区污水处理率应达到 83%以上,各县(市)达到 70%以上。以上年各污水处理厂污水处理率为基础,提出下年度目标。(三)减排信息报送情况。包括污水处理厂运行情况月报,上级通报中提出问题的原因分析、整改措施等信息、报告和台帐资料等,应及时上报市排水管理处,且确保上报信息必须完整、准确。第六条 各责任主体和市城市排水有限公司应将污水处理厂运

39、行情况月报表于次月 3 日前上报市排水管理处,以及省建设厅报表系统和国家建设部报表系统。半年度和年度工作总结分别于 7 月 3 日和次年的 1 月 3 日前报市排水管理处。其他书面材料应按规定时间及时上报。第七条 市城市管理局组织对各地的 COD 减排工作进行年度考核评比,通过对各责任主体上报的信息材料、台帐资料等采取书面核查、现场检查、跟踪调查等方式进行考核评分,并将考核评比结果抄送各县(市)、区人民政府。第八条 市城管部门每半年通报一次各地污水处理厂 COD 减排完成情况。对存在以下情形的,予以通报批评,必要时向责任单位发整改通知,限期整改。(一)考核结果不合格;First complia

40、nce review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through compliance reviews,

41、be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements; (3) the sim

42、ilar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the number of an

43、d references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 points) tender a

44、gent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 million Yuan have

45、2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar projects: pr

46、oxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performance (10 points)

47、 Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated winning amou

48、nt calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (since January 1,

49、2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the development and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 实用文档 > 规章制度

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:道客多多官方知乎号:道客多多

经营许可证编号: 粤ICP备2021046453号世界地图

道客多多©版权所有2020-2025营业执照举报