收藏 分享(赏)

机组振动作用下厂房机墩结构振幅计算方法研究.doc

上传人:无敌 文档编号:26030 上传时间:2018-03-04 格式:DOC 页数:8 大小:98.50KB
下载 相关 举报
机组振动作用下厂房机墩结构振幅计算方法研究.doc_第1页
第1页 / 共8页
机组振动作用下厂房机墩结构振幅计算方法研究.doc_第2页
第2页 / 共8页
机组振动作用下厂房机墩结构振幅计算方法研究.doc_第3页
第3页 / 共8页
机组振动作用下厂房机墩结构振幅计算方法研究.doc_第4页
第4页 / 共8页
机组振动作用下厂房机墩结构振幅计算方法研究.doc_第5页
第5页 / 共8页
点击查看更多>>
资源描述

1、 , , , , , ; , , , , ; ; ; ; (1987-) , , , , , E-mail: Research on Methods for Powerhouse Turbine Pier Amplitude under Vibration Load Zhang Zhijun Chengdu Engineering Corporation Limited, China Power Construction Corporation; Abstract Magnification of units in hydropower plant leads to increase of t

2、urbine pier size and traditional codes method has not been able to meet the requirements of design and calculation.Finite element method has been popularized greatly, but what kind of finite element method shall be adopted, whether calculation result of finite element method is reasonable or not and

3、 how to evaluate difference between these two methods needs to be solved.Through comprehensive comparison and analysis of codes method and finite element method for turbine pier vertical amplitude in powerhouses, several conclusion is obtained.Calculation result of quasi-static method is larger than

4、 dynamic method and calculation result of dynamic method is larger than codes method.Location of bottom boundary in finite element model has great influence on turbine pier amplitude, so amplitude relative to the reference plane shall be calculated and installation elevation plane should be selected

5、 as reference plane.For finite element method calculation results, its more reasonable to compare amplitude relative to installation elevation plane with allowable limit. Keyword turbine pier amplitude; codes method; quasi-static method; dynamic method; 0 , , ; , , , , , , , , 1, , , , , 2-3 SL 266

6、2014 4 ( ) , 5-6, , , 7 , , 8-9 10, , Ansys , , 1 1 1 Table 1 Load and load combination of turbine pier , , , , 1 , , : 0.15 mm 2 : :A1 , m;P1 , k N, 1 , s, ;w1 , s;G1 i , k N;P0 , k N;Pn , k N;n01 , r/min;n1 , r/min;n2 , r/min; 3 , , 1.5 , , , , , , : (1) 1.3 ; 0.05 (2) (3) 1.5 , , , (4) : , , , ,

7、4 , , 4.1 , , , , 2 2 Table 2 Turbine pier vertical amplitude of schemes 2 , , , 4.2 , 4 1: , , , ; 2: , ; 3: ( ) ; 4: ( ) 4 14 1 1 Fig.1 Model for scheme 1 , 4 , , 3 4 , , 2 2 Fig.2 Model for scheme 2 3 3 Fig.3 Model for scheme 3 4 4 Fig.4 Model for scheme 4 3 Table 3 Turbine pier vertical amplitud

8、e of parts in plants for schemes 4 , ( 4) , , 4 Table 4 Turbine pier vertical amplitude relative to installation elevation plane of parts in plants for schemes 4.3 4 , , , , 5 , , 6 , , , , , 5 Table 5 Turbine pier vertical amplitude of schemes with dynamic method and codes method 6 Table 6 Turbine

9、pier vertical amplitude relative to installation elevation plane of schemes with dynamic method and codes method 5 (1) , , (2) , , , , (3) (4) , (5) , , , 1 , , , . J. , 2008, 26 (1) :119-122. (Song Zhiqiang, Ma Zhenyue, Zhang Yunliang, et al.Stiffness analysis of composite turbine pier structure of

10、 Xiaowan Power StationJ.Water Resources and Power, 2008, 26 (1) :119-122. (in Chinese) ) 2 . J. , 2003 (1) :4-9. (Song Enlai.Research on the building vibration and reinforcement of Hongshi Hydroelectric Generating StationJ.Northeast Electric Power Technology, 2003 (1) :4-9. (in Chinese) ) 3 , , , .

11、J. , 2008, 41 (2) :100-104. (Ouyang Jinhui, Zhang Chaoran, Chen Houqun, et al.Prediction of the vibration of giant-cale hydropower housesJ.China Civil Engineering Journal, 2008, 41 (2) :100-104. (in Chinese) ) 4 . (SL266 2014) S.2014. hydropower house (SL 266 2014) S.2014. (in Chinese) ) 5 , , , . J

12、. ( ) , 2004, 26 (2) :111-115. (Ma Zhenyue, Chen Jing, Liu Zhiming, et al.Vibration analysis of powerhouse of Three Gorges Hydropower StationJ.Journal of China Three Gorges University (Natural Sciences) , 2004, 26 (2) :111-115. (in Chinese) ) 6 , , . J. , 2004, 35 (8) :37-40. (Lian Jijian, Wang Haij

13、un, Wang Rixuan.Study on dynamic characteristics of the powerhouse structure of run of river power plantJ.Water Resources and Hydropower Engineering, 2004, 35 (8) :37-40. (in Chinese) ) 7 , , . J. , 2014, 34 (4) :16-19. (Chen Peng, Wu Hegao, Yuan Wenna.Research on range of numerical model for calcul

14、ating amplitude of generator pier of underground powerh-ouseJ.Advances in Science and Technology of Water Resources, 2014, 4 (4) :16-19. (in Chinese) ) 8 , , , . J. , 2007, 38 (9) :1090-1095. (Cao Wei, Zhang Yunliang, Ma Zhenyue, et al.Vibration analysis of roof overflow powerhouseJ.Journal of Hydra

15、ulic Engineering, 2007, 38 (9) :1090-1095. (in Chinese) ) 9 , . J. , 2007, 26 (5) :134-137. (Zhang Huidong, Zhou Ying.Study of fluid-solid interaction vibration characteristics of the large scale power-house structureJ.Journal of Hydroelectric Engineering, 2007, 26 (5) :134-137. (in Chinese) ) 10 , , , . J. , 2013, 9 (3) :518-522. (Zhang Yumin, Yang Jihua, Cui Zhen, et al.Seismic response simulation of underground cavern group based on quasi-static methodJ.Chinese Journal of Underground Space and Engineering, 2013, 9 (3) :518-522. (in Chinese) )

展开阅读全文