1、SH/T 3503-J406-1管道系统耐压试验条件确认与试验记录(一)Record of Piping System Pressure Test and Test Condition Confirmation(I)工程名称:Project:单元名称:Unit:Description System No.Inspection items and requirements Result Pipe installation shall be in compliance with design document and specification.Pipeline components have b
2、een re-inspected and are acceptable.Welders complete operation records are available.NDE results shall be in compliance with design document and specification.PWHT results shall be in compliance with design document and specification.Supports and hangers shall be correctly installed.Identifications
3、on material of alloy steel pipeline are clear.Safety attachments and instruments not involved in test have been dismantled or isolated as per requirement, all system valves involved in test have been opened. Temporary reinforcement measures, blind positions and markings shall be in compliance with c
4、onstruction plan.Scale, accuracy and calibration state of test use pressure gauge shall be in compliance with specification.Test use water of stainless steel pipeline shall be in compliance with specification.Test record Pipeline No.Design pressureMPaDesign Temp.Test ambient Temp.Test mediumTest med
5、ium Temp. Test pressureof pressure testMPaTightness test pressure MPaOwner/Construction Supervision Contractor General Contractor Construction ContractorDiscipline engineer:Date:Discipline engineer:Date:Discipline engineer:Quality inspector:Construction foreman:Date:D.6 SH/T3503J406“管道系统耐压试验条件确认与试验记录” ,系管道系统压力试验前,建设/监理单位、施工单位应按记录中所列 12项内容进行检查,确认合格后方可进行系统耐压试验并记录。