1、SH/T 3503-J201地基验槽(坑)记录Foundation Pit Inspection Record工程名称:Project:单元名称:Unit:Construction Drawing No.Inspection LocationExcavationDimensionsPitInspection1. The excavation of foundation pit is performed to Course _ indicated in the survey report. The bearing course is Course_.2. The absolute altitud
2、e and relative elevation of the bottom of the foundation pit are _ respectively.3. Soil conditions_.4. Pile location_, pile type_, quantity _; The bearing capacity meets the design requirements.5. Others_.Attached: Construction Record Pile Test ReportConclusionNote:If no pile or manual shore is invo
3、lved in the civil work,the blank for Item 4 shall be crossed out.Owner/Supervision ContractorDesign/General Contractor Survey Contractor Construction ContractorDiscipline engineer:Date:Discipline engineer:Date:Discipline engineer: Date:Discipline engineer:Quality inspector:Prepared by:Date:SH/T 35032007B.1 SH/T3503J201“地基验槽(坑)记录” 。构筑物均应进行施工验槽,检查内容包括基坑位置、平面尺寸、持力层核查、基底绝对高程和相对标高、基坑土质及地下水位等,有桩支护或桩基的工程还应填写桩的检查状况。地基验槽检查记录应由建设/监理、勘察、设计和施工单位共同验收签认。 “检验结论”栏原则上应由勘察单位人员填写。若勘察或设计等单位委托监理单位执行该工作,应有相关的书面委托文件。地基验槽未通过,需要进行地基处理,应由勘察单位人员提出、设计单位出具处理意见和做法。