1、 Yanbu National Petrochemical Company Yanbu Petrochemical Complex U anti-two blocking; operating radius in accordance with lifted load; pressures in hydraulic or pneumatic circuits Load limiting devices, and acceleration and deceleration limiters, shall be installed in enclosures that can be locked
2、or sealed to inhibit unauthorized tampering. A wind velocity-indicating device shall be mounted at or near the top of the crane. Velocity readout shall be provided at the operators in the cab, and a visible or audible alarm shall be triggered in the cab when the wind velocity exceeds 20 miles per ho
3、urs. Crane operation shall stop when the wind velocity is at or exceeds 20 miles per hour. Crane booms 30-meter in length or greater, should be either lowered to the ground over night or, the load block should be anchored to a suitable secure object and a slight load placed on the crane block to pre
4、vent the crane boom moving when there is no crane operator on site and the crane therefore unattended. Categories of lifts listed below will require an engineered lift permit Yanbu National Petrochemical Company Yanbu Petrochemical Complex U anti-two blocking; operating radius in accordance with lif
5、ted load; pressures in hydraulic or pneumatic circuits; and crane travel at both ends of the runway tracks. Load limiting devices, and acceleration and deceleration limiters, when provided, shall be installed in enclosures that can be locked or sealed to inhibit unauthorized tampering. The operator
6、should be trained, experienced and qualified for the operation of that specific make and model of tower crane. The utilizing Contractor should provide operator experience documentation even if he is using a subcontractor on site. The manufacturers operator manual shall be kept with the crane while i
7、t is onsite. A wind velocity-indicating device shall be mounted at or near the top of the crane. Velocity readout shall be provided at the operators station in the cab, and a visible or audible alarm shall be triggered in the cab and at remote control stations when the preset wind velocity has been
8、exceeded. Crane shall stop activity when manufacturers wind velocity specification is below 20 miles per hour limit, but will not operate when the velocity exceeds 20 miles per hour. Regular inspections and maintenance of the cranes should be conducted and performed in accordance with the manufactur
9、ers specifications and applicable ANSI standards. Records ahall be maintained for Owners review. 39. Equipment and Motor Vehicles All equipment must be inspected daily before use by Contractors operator using a checklist approved by Owner. Contractor must also make formal monthly inspections with pr
10、oper documentation maintained and copies shall be made available to Owner upon request. Defective equipment shall be repaired or removed from service immediately. All rubber tired, self propelled scrapers, rubber tired, front-end loaders, rubber tired dozers, wheel type agricultural and industrial t
11、ractors, crawler tractors, crawler type Yanbu National Petrochemical Company Yanbu Petrochemical Complex U & O Project Fluor Arabia Limited Contract A2IT Site Safety Procedures Manual July 2005 Page 25 of 38 H:000_GeneralShare501 - ConstructionSITE SAFETY PROCEDURES17-SubCon-Requirements.doc GENERAL
12、 SITE CONDITIONS AND SAFETY PROCEDURES loaders and motor graders shall be equipped with rollover protective structures and seat belts. All Contractors operators of construction equipment must have a valid Saudi Government equipment operators license and certified for that specific equipment by a com
13、petent person. Copies of the certifications shall be maintained on jobsite by Contractor and made available to Owner upon request. All motorized equipment must have a reverse signal alarm audible at 30 meter distance above the surrounding noise level. In addition while the equipment is being operate
14、d shall have a flagman wearing a yellow reflective vest and equipped with a red flag and a green flag. All cracked and broken glass shall be replaced before bringing vehicles on the jobsite. If glass is broken or damaged on jobsite and if damage is severe enough to cause a potential safety problem,
15、the machine shall be stopped until such damage has been repaired. Vehicles used to transport employees shall have seats firmly secured and adequate for the number of employees to be carried and all passengers should be properly seated. Standing on the back of moving vehicles is prohibited. It is not
16、 allowed to transport employees in the back of pick-up trucks or any open vehicle. Owner shall review and approve locations for storage of all fuels, lubricants, starting fluids prior to use by Contractor for storage. The Owner will inspect all vehicles and fuel driven construction equipment prior t
17、o mobilizing it onto the jobsite. The condition of the vehicle, equipment operator/driver license, operator competency certification and insurance will be reviewed prior to the issuance of a site access pass. Contractor shall equip all vehicles and fuel driven construction equipment with a fire exti
18、nguisher, red triangles, flashlight and a first aid kit. 40. Electrical All electrical work, installation, modification and wire capacities shall be in accordance with the pertinent provisions of the National Electric Code and ANSI standards, and shall be approved by Owners electrical engineer. Cont
19、ractor shall develop a ground fault program in accordance with Owners and OSHA requirements. In addition to ground fault protection, Contractor shall establish a monthly assured grounding inspection program to include color coding. Contractor shall use Owners lockout/tag-out system, and shall strict
20、ly adhere to the use of this procedure. Owner will monitor adherence to the procedure on a regular basis. Yanbu National Petrochemical Company Yanbu Petrochemical Complex U & O Project Fluor Arabia Limited Contract A2IT Site Safety Procedures Manual July 2005 Page 26 of 38 H:000_GeneralShare501 - Co
21、nstructionSITE SAFETY PROCEDURES17-SubCon-Requirements.doc GENERAL SITE CONDITIONS AND SAFETY PROCEDURES All temporary power panels shall have covers installed at all times. All open or exposed breaker spaces shall be adequately covered and is subject to the approval of Owners safety manager and/or
22、electrical engineer. All electrical power generators and welding machines shall be properly grounded. 41. Monthly Inspection Program All of the following:- fuel driven construction equipment, hand and power tools, electrical equipment, electrical man-lifts, man-baskets, gas cylinder cradles used for
23、 lifting, lifting equipment including slings, spreader bars and shackles, cranes, temporary pipe supports and pipe supports in fabrication shops, hoists, temporary electrical distribution boards, fire extinguishers, welding and cutting equipment, ladders, fall protection devices such as full body ha
24、rnesses and inertia real fall arrest systems, shall be inspected monthly by competent persons and color coded before the third day of each month. All equipment shall bear a color coded sticker or tag with the Contractors name, Contractors own equipment identification/serial number or manufacturers m
25、odel or serial number, date of inspection and the signature of the competent person inspecting the equipment. Equipment without a valid inspection by a competent person and valid color-coding shall not be used and removed from the project site and the access pass cancelled. Should Contractor still n
26、eed to use the equipment on the project then Contractor has to start over the process of obtaining access for that equipment. The color codes used on this project are: Yellow Blue Orange Green Red White January February March April May June July August September October November December 42. Ladders
27、 All ladders shall comply with the requirements as per OSHA CFR 1926 for Construction. Makeshift wooden ladders and painted wooden ladders shall not be used. Ladders shall be inspected weekly by a competent person. Ladders shall be tagged and with the same tags used for scaffolds. When not secured a
28、t the top, ladders will be properly anchored at the base to prevent the footings from slipping and a second person shall hold the ladder firm in place while being used. Yanbu National Petrochemical Company Yanbu Petrochemical Complex U & O Project Fluor Arabia Limited Contract A2IT Site Safety Proce
29、dures Manual July 2005 Page 27 of 38 H:000_GeneralShare501 - ConstructionSITE SAFETY PROCEDURES17-SubCon-Requirements.doc GENERAL SITE CONDITIONS AND SAFETY PROCEDURES When ladders are being used for accessing at the same point more than once, it shall be properly secured at the top and extend at le
30、ast one meter above the landing or work surface. Ladders shall always be supported on the ground or floor but never hung. Ladders shall always be used at an angle of 75%. Ladders shall not be used in a vertical position. 43. Floor and Wall Openings and Stairways Floor and wall openings shall be guar
31、ded by a standard guardrail, mid-rail, and toe-board, or adequately covered. Guardrails must be of sufficient strength to support 100 kilograms of pressure when applied at mid-span of the guardrail parallel with the floor and perpendicular to the guardrail with a maximum deflection of 75mm. Covers m
32、ust be adequately secured to prevent displacement and have Danger signs attached identifying the hazard. Every flight of stairs having two or more risers shall be equipped with standard stair railings. Stairs are not to be used until risers and railings are securely installed. Treads will be poured
33、as soon as possible where poured treads apply. Debris and other loose materials shall not be allowed on stairways or at access point to stairway. Debris shall not be allowed to accumulate in stairwells. 44. Excavations and Trenching A competent person must be designated and trained in soil classific
34、ation and the recognition of trenching and excavation hazards. Appropriate documentation to meet the Owners trenching and excavation standards is to be kept on site. Prior to opening any excavation or trench, Contractor must obtain approval from Owner. In addition, Contractor shall contact any other
35、 necessary personnel to determine whether underground installations such as sewer, telephone, fuel, electric, water lines may be encountered and where they are located. Only hand excavation shall be permitted where confirmation regarding absence of underground facilities cannot be achieved. Excavati
36、ons and trenches shall be inspected by a competent person daily and after every rainfall to determine if they are safe. Yanbu National Petrochemical Company Yanbu Petrochemical Complex U & O Project Fluor Arabia Limited Contract A2IT Site Safety Procedures Manual July 2005 Page 28 of 38 H:000_Genera
37、lShare501 - ConstructionSITE SAFETY PROCEDURES17-SubCon-Requirements.doc GENERAL SITE CONDITIONS AND SAFETY PROCEDURES All banks 1.2 meters high or more shall be sloped to 34 degrees unless soil is analyzed by a competent person allowing a greater slope angle or shall be adequately shored. Ladders o
38、r steps shall be provided and secured in all trenches 1.2 meters or more in depth. Ladders or steps shall be located to require no more than 7.5 meters of lateral travel before having accessed or egress and shall extend 1.0 meter above the top of the trench bank. Material excavated shall be stored a
39、t least one meter from the edge of the excavation or trench or shall be shored to prevent material from falling into the excavation. All trenches and excavations shall be properly barricaded with a hard physical barricade (not tape or rope) to prevent persons from walking into them. All walkways or
40、ramps crossing over excavations shall be securely fastened and equipped with standard guardrails. 45. Steel Erection At no time shall there be more than 3 floors or 12 meters of unfinished bolting or welding above the foundation or uppermost permanently secured floors. A temporary and/or permanent f
41、loor shall be maintained within 2 stories or 10 meters, whichever is less, below and directly under that portion of each tier of beams on which any work is being performed. Planking or metal decking in temporary floors shall be of proper strength and thickness to carry the working load. Decking shal
42、l be secured to prevent movement. Standard guardrails and toe-boards shall be installed around open sides of permanent floors. During structural steel assembly scaffold tubing shall be used to construct railings to scaffold specifications or, a safety railing (cable) of 12mm diameter shall be instal
43、led approximately 1.1 meter high, recessed into interior of floor around all temporary floors. Where fall distance exceeds 1.8 meters, scaffolds, ladders, catch platforms or safety harnesses with lanyard attached to lifelines or other substantial objects shall be used. If the use of these is impract
44、ical, safety nets shall be provided. Tag lines shall be used to control all loads. Containers shall be provided for storing or carrying bolts or rivets. When bolts, drift-pins, or rivet heads are being removed, a means shall be provided to prevent accidental displacement. Tools shall be provided lan
45、yards to prevent falling. During the final placing of solid web structural members, the load shall not be released from the hoisting line until the members are secured with not less than 2 bolts or equivalent at each connection. Yanbu National Petrochemical Company Yanbu Petrochemical Complex U & O
46、Project Fluor Arabia Limited Contract A2IT Site Safety Procedures Manual July 2005 Page 29 of 38 H:000_GeneralShare501 - ConstructionSITE SAFETY PROCEDURES17-SubCon-Requirements.doc GENERAL SITE CONDITIONS AND SAFETY PROCEDURES Contractor shall not allow any of Contractors employees to walk the stee
47、l. A safe means of access to the level being worked shall be maintained. Climbing and sliding columns are not considered safe access and not allowed. 46. Confined Areas or Spaces Contractor shall develop an entry procedure to be used when Contractors employees are required to enter confined areas or
48、 spaces. This procedure shall be in strict compliance with Owner Safety and Health Procedures. Non-permit required confined space entry procedures are not allowed. Confined space entries of all types shall be treated, as permit required confined spaces. Such areas include storage tanks, process vess
49、els, bins, boilers, ventilation or exhaust ducts, sewers, underground utility vaults tunnels, pipelines, open topped pits, basements and temporary wood framing covered with plastic. All of Contractors employees who are required to enter confined areas or spaces shall be instructed as to the nature of hazards involved, necessary precautions to be taken and in the use of protective and emergency equipment required. Before Contractors emplo