收藏 分享(赏)

OclaroRMAProcesswithremarkson40GproductActon.ppt

上传人:hwpkd79526 文档编号:8434119 上传时间:2019-06-26 格式:PPT 页数:6 大小:751.50KB
下载 相关 举报
OclaroRMAProcesswithremarkson40GproductActon.ppt_第1页
第1页 / 共6页
OclaroRMAProcesswithremarkson40GproductActon.ppt_第2页
第2页 / 共6页
OclaroRMAProcesswithremarkson40GproductActon.ppt_第3页
第3页 / 共6页
OclaroRMAProcesswithremarkson40GproductActon.ppt_第4页
第4页 / 共6页
OclaroRMAProcesswithremarkson40GproductActon.ppt_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、RMA Process for 40G product Shenzhen,Updated in Nov. 16th, 2011,Content,Shenzhen RMA policy RMA tracked by CAT Standard RMA process flow Remarks for 40G RMA management,Shenzhen RMA policy,Oclaro Shenzhen follow operates procedure GL-CS-305-01 Global Customer Returns Process for returned products han

2、dling. Authorisation is required prior to return of any product. Lot rejections will not be accepted without formal written agreement with Oclaro. Returns are investigated at Oclaros discretion to determine root cause of failure. Permanent corrective and preventive actions are implemented as a resul

3、t of investigations to prevent future occurrence. Investigation results will be regularly communicated to customers. Target closure is 28 days from receipt (in case of fast-track ticket, target closure is 14days).,RMA tracked by CAT,All RMAs are tracked through CAT (Corrective Action Tool),Register

4、RMA on CAT,Approve RMA request,Receive device and Booking in on CAT,Investigate and submit analysis report,Close RMA on CAT,Inform Originator the closure,CSR,CQE,Logistic,Engineering,PQE,CQE,Effective,RMA request,End,Customer,Effective,CAT,Send RMA report tocustomer,CSR/ Sales,Responsibility,Respons

5、e time (calendar days ),CQE,No,No,Yes,Yes,2 days,20 days,2 days,2 days,2 days,0 day,Total 28 days,Standard RMA Process Flow,Remarks for 40G RMA management,For the 40G product return redirected to Shenzhen, RMA ticket will be raised in CAT system and tracked with RMA process, if Acton shall be involv

6、ed on some technical level, communication can be made by PE engineer with Acton, it is the responsibility of PE engineer to update CAT. For the 40G product return managed directly by Acton team, the process here discussed will not cover it. In case Acton team, need to use CAT system, Shenzhen CAT administrator can give a introduction of such tool. Technical analysis flow of the product will be reviewed by relevant PE engineer with Acton team.,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 企业管理 > 管理学资料

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:道客多多官方知乎号:道客多多

经营许可证编号: 粤ICP备2021046453号世界地图

道客多多©版权所有2020-2025营业执照举报