收藏 分享(赏)

11W网规高培-UTRANKPI.ppt

上传人:yjrm16270 文档编号:8432553 上传时间:2019-06-26 格式:PPT 页数:45 大小:2.02MB
下载 相关 举报
11W网规高培-UTRANKPI.ppt_第1页
第1页 / 共45页
11W网规高培-UTRANKPI.ppt_第2页
第2页 / 共45页
11W网规高培-UTRANKPI.ppt_第3页
第3页 / 共45页
11W网规高培-UTRANKPI.ppt_第4页
第4页 / 共45页
11W网规高培-UTRANKPI.ppt_第5页
第5页 / 共45页
点击查看更多>>
资源描述

1、,WCDMA UTRAN KPI,Introduction,KPI definition Key performance indicator KPI entity RNC level Cell level Clutter/region level (customized) KPI analysis Network performance surveillance Trouble shooting network problems Network trend analysis,UTRAN KPI Overview,The UTRAN KPI can be divided into 5 catal

2、ogs Accessibility:UTRAN Call Setup Retainability:UTRAN Call Drop Mobility:UTRAN Mobility Management Traffic:Resource and Traffic management Algorithm: Radio Resource Management Algorithm Management,Contents,UTRAN Call Setup UTRAN Call Drop UTRAN Mobility Management Traffic Management Algorithm Manag

3、ement,UTRAN Call Setup,UTRAN Call Setup includes the RRC connection setup and the RAB establish procedure. The Successful call setup involves the success RRC and RAB setup. The main indicators are RRC Setup Success Rate RAB Setup Success Rate,RRC Setup Counter,Measurement Point Stat. Number of RRC C

4、onnection Request in Point A1 of Figure1 Stat. Number of RRC Connection Setup in Point B of Figure1 Stat. Number of RRC Connection Setup complete in Point C of Figure1 Stat. Number of RRC Connection Reject in point A of Figure2,F1:successful RRC connection setup procedure F2: RRC connection reject p

5、rocedure,RRC Setup Counter,RRC Setup KPI RRC Connection Setup Success Rate = RRC Connection Setup complete / RRC Connection Request Main counter RRC Connection Request RRC Connection Setup RRC Connection Reject RRC Connection Setup complete,RRC Setup Counter,Request cause counter Originating convers

6、ational call Terminating conversational call Inter-RAT cell re-selection Inter-RAT cell change order Registration Failure cause counter RRC Reject RRC setup no response,RAB Setup Counter,Measurement Point Stat. Number of RAB Setup Request in Point A of Figure1 Stat. Number of RAB Setup Success in Po

7、int B of Figure1 Stat. Number of RAB Setup Failure in Point B of Figure2,F1: Successful RAB setup procedure F2: RAB setup failure procedure,RAB Setup Counter,RAB Setup KPI CS RAB Success rate = CS RAB Setup Success/CS RAB Setup Request PS RAB Success rate = PS RAB Setup Success/CS RAB Setup Request

8、Overall counter CS RAB Setup Request CS RAB Setup Success CS RAB Setup Failure PS RAB Setup Request PS RAB Setup Success PS RAB Setup Failure Traffic class based counter Conversational Streaming Interactive Background,RAB setup counter,Typical bearer based counter AMR speech CS64kbps PS64kbps PS128k

9、bps PS384kbps Failure cause counter Invalid parameters Unavailable Transport Layer failure Other cause,Contents,UTRAN Call Setup UTRAN Call Drop UTRAN Mobility Management Traffic Management Algorithm Management,Call Drop Counter,Measurement Point Stat. Number of Call Drop in Point A of Figure1 and i

10、n Point A of Figure2 Definition of Call Drop : Abnormal RAB release triggered by RNC,F1: RAB release request procedure F2: Iu connection release request procedure,Call Drop Counter,Call Drop KPI AMR Call Drop Rate = AMR Call Drop / AMR RAB Setup Success VP Call Drop Rate = VP Call Drop / VP RAB Setu

11、p Success PS Call Drop Rate = PS Call Drop / PS RAB Setup Success Overall counter CS call drop PS call drop Traffic class based counter Conversational Streaming Interactive Background,Call Drop Counter,Typical bearer based counter AMR speech CS64kbps PS64Kbps PS128Kbps PS384Kbps Call drop cause coun

12、ter RF loss RLC reset AAL2 failure GTPU loss Other cause,Contents,UTRAN Call Setup UTRAN Call Drop UTRAN Mobility Management Traffic Management Algorithm Management,UTRAN Mobile Management,The UTRAN Mobile Management focus on the KPIs of the handover procedures. Soft handover Hard handover InterRAT

13、handover InterRAT cell change order Cell update,SHO counter,Measurement Point Stat. Number of SHO request in Point B of Figure1 Stat. Number of SHO success in Point C of Figure1 Stat. Number of SHO failure in Point C of Figure2 and in Point C of Figure3,F1: Successful SHO procedure F2: SHO failure p

14、rocedure (activeset update failure) F3:SHO failure procedure (time out),SHO counter,Soft handover KPI Soft HO Success rate=Soft HO success / Soft HO request Softer HO Success rate=Softer HO success / Softer HO request Overall counter Soft HO request Soft HO success Softer HO request Softer HO succes

15、s Typical Service based counter AMR speech CS64kbps PS64kbps PS128kbps PS384kbps,SHO counter,Failure cause counter configuration unsupported incompatible simultaneous reconfiguration invalid configuration No response Other cause SHO factor counter (1 radio link, 2 radio links, 3 radio links) active

16、set SHO factor (based on radio link) = active set average link number -1 SHO factor (based on UE) = (2 radio links active set + 3 radio links active set) / (1 radio links active set + 2 radio links active set + 3 radio links active set),HHO counter,Measurement Point Stat. Number of HHO request in Po

17、int B of Figure1 Stat. Number of HHO success in Point C of Figure1 Stat. Number of HHO failure in Point A of Figure2 and in Point A of Figure3,F1: Successful HHO procedure F2: HHO failure (physical channel configuration failure) F3:HHO failure (time out),HHO counter,HHO KPI Intra-frequency HHO Succe

18、ss rate = Intra-frequency HHO success / Intra-frequency HHO request Inter-frequency HHO Success rate = Inter-frequency HHO success / Inter-frequency HHO request Overall counter Intra-frequency HHO request Intra-frequency HHO success Intra-frequency HHO failure Inter-frequency HHO request Inter-frequ

19、ency HHO success Inter-frequency HHO failure,HHO counter,Typical Service based counter AMR speech CS64kbps PS64kbps PS128kbps PS384kbps Failure cause counter Configuration unsupported Physical channel failure Incompatible simultaneous reconfiguration Cell update occurred Invalid configuration No res

20、ponse Other cause,Inter-RAT Handover out counter,Measurement Point Stat. Number of Handover outgoing prepare in Point A Stat. Number of Handover outgoing prepare success in Point B Stat. Number of Handover outgoing attempt in Point C Stat. Number of Handover outgoing success in Point D,F1: Successfu

21、l inter-RAT HO outgoing procedure,Inter-RAT handover out counter,Inter-RAT handover KPI Inter-RAT handover out prepare success rate = Handover outgoing prepare success/Handover outgoing prepare Handover outgoing success rate = Handover outgoing success/Handover outgoing attempt Overall counter Hando

22、ver outgoing prepare Handover outgoing prepare success Handover outgoing attempt Handover outgoing success,Inter-RAT handover out counter,Failure cause counter Prepare failure Relocation Failure in Target CN/RNC or Target System TRELOCalloc Expiry Relocation not supported in Target RNC or Target sys

23、tem No Resource Available Unknown Target RNC No response Handover failure Configuration Unsupported Physical Channel Failure Unspecified Relocation abort No response Other cause,Inter-RAT handover in counter,Measurement Point Stat. Number of Handover incoming request in Point A Stat. Number of Hando

24、ver incoming prepare success in Point B Stat. Number of Handover incoming success in Point C,F1: Successful inter-RAT HO incoming procedure,Inter-RAT handover in counter,Inter-RAT handover in KPI Handover in prepare success rate = Handover incoming prepare success/Handover incoming request Handover

25、in success rate = Handover incoming success/Handover incoming request Overall counter Handover incoming request Handover incoming prepare success Handover incoming success,Inter-RAT handover in counter,Failure cause Prepare failure No Resource Available Relocation Failure in Target CN/RNC or Target

26、System Relocation not supported in Target RNC or Target system Relocation abort Other cause Handover failure Relocation abort No response Other cause,Inter-RAT cell change counter,Measurement Point Stat. Number of cell change outgoing request in Point B of Figure1 and Point A of Figure2 Stat. Number

27、 of cell change outgoing success in Point D of Figure1 and Point B of Figure2,F1: UTRAN-controlled cell change outgoing procedure F2: UE-controlled cell change outgoing procedure,Inter-RAT cell change counter,Inter-RAT cell change KPI Success rate = Cell change success / Cell change outgoing request

28、 Overall counter Cell change outgoing request Cell change outgoing success Typical bearer based counter PS64kbps PS128kbps PS384kbps Failure cause counter Configuration unacceptable Physical Channel Failure Unspecified No response Other,Cell update counter,Measurement Point Stat. Number of cell upda

29、te request in Point A Stat. Number of cell update success in Point B in case1 or case2 Stat. Number of cell update success in Point C in case3 Case1:the UE camps on the same cells and keeps in CELL_PCH state before and after cell update Case2:the UE camps on the same cells and keeps in CELL_FACH sta

30、te before and after cell update, also the update cause is not cell reselection Case3: all cases except case1 and case2,F1: cell update procedure,Cell update counter,Cell update KPI Cell update success rate = Cell update success/Cell update request Overall Counter Cell update request Cell update succ

31、ess Cell update cause counter Cell reselection Periodical cell update Uplink data transmission Paging response Re-entered service area Radio link failure RLC unrecoverable error,Contents,UTRAN Call Setup UTRAN Call Drop UTRAN Mobility Management Traffic Management Algorithm Management,Traffic Counte

32、r,User number RRC state based user number Cell DCH, Cell FACH, Cell PCH, URA PCH Traffic class based equivalent user Conversational Streaming Interactive and background Cell throughput Directional counter Cell uplink throughput Cell downlink throughput Traffic class based counter Conversational, str

33、eaming, interactive, background All supported bandwidth,Traffic Counter,Iub bandwidth utilization Common channel (RACH, FACH, PCH) volume Traffic class based service volume Uplink and downlink volume OVSF code utilization SF based SF=4 SF=8 SF=512 RTWP and Carrier Power Cell RTWP Transmission Carrie

34、r Power,Contents,UTRAN Call Setup UTRAN Call Drop UTRAN Mobility Management Traffic Management Algorithm Management,Algorithm Counter,DCCC Overall counter Channel switch request Channel switch success DCHDCH channel switch counter Channel switch success (DL Bit Rate upgrade ) Channel switch success

35、(DL Bit Rate degrade ) DCHFACH/RACH channel switch counter Channel switch success (To common channel) Channel switch success (From common channel) AMRC Uplink AMR control counter (degrade) Downlink AMR control counter (upgrade) CAC UL Admission deny counter DL Admission deny counter,Appendix: Nastar

36、 KPI Analysis Routine,Define monitor area: RNC group or cell group,Query Performance Item,Query Top N cell list,Query related item,Import raw data,Define cluster,Select Issue,Find out trouble cause,Raw counter Analysis,Select performance analysis issue,Query metric item, find the fault or trouble,Qu

37、ery TopN cell list in pre-defined cluster, find the worst cell or cell group,Query related metric item in the specified worst cells,Query and find out the fault or trouble cause,Analyze raw counter if necessary,Import performance counter from NE M2000,Step1: Check RRC metric item by “RRC setup analy

38、sis” issue,RRC Setup Rate is lower,Appendix: Nastar KPI Analysis Example,Step2: Find the worst TopN cell list in former cluster by “Forward”,Appendix: Nastar KPI Analysis Example,Step3: Find the worst cell in TopN list,Appendix: Nastar KPI Analysis Example,Step4: Query RRC reject cause in specified cell by “Forward”,Appendix: Nastar KPI Analysis Example,Step5: Find the RRC reject cause in the worst cell,Appendix: Nastar KPI Analysis Example,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 企业管理 > 管理学资料

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:道客多多官方知乎号:道客多多

经营许可证编号: 粤ICP备2021046453号世界地图

道客多多©版权所有2020-2025营业执照举报