1、 CONCRETE FLOOR SLAB PRE-POUR INSPECTION LOG混凝土地坪施工前检查表Location/Room Name of Project 位置/房间 项目名称Building name/exterior inspector 建筑物/室外 检查人Slab contractor date 地坪承包商base grade condition:基层条件基层坡度符合设计要求,slopes for subgrade per drawing地坪基层密实度测试 compact density report基层标高符合设计要求,the elevation of grade is
2、correct地坪基层清洁,无杂物及积水。The grade is clean and no water地面地漏,清扫口以及套管和预埋件位置及标高正确。Drains, sleeve, embedding in place, correct elevation隔汽层安装。 Vapour barrier installedEnvironment:施工环境温度符合地坪施工要求, temperature within application range 通风, 洁净的空气, ventilation- clean air施工区域维护及相应的保护, area barricaded and protecte
3、d地漏及其他套管封闭以防施工堵塞,floor drains plugged to prevent backups临近区域表面覆盖保护, adjacent surface masked or covered汽车混凝土泵及运输车辆通道,the location and access for concrete pump and truck.Concrete base slab reinforcement:混凝土地坪钢筋钢筋复检合格, steel retest report meet design requirement钢筋绑扎符合设计图纸要求,reinforcement placed where i
4、ndicated on drawing混凝土地坪施工缝处,钢筋切断,reinforcement cut in the construction joint上层钢筋支撑良好,reinforcement support properly施工区域维护及相应的保护, area barricaded and protected凹角钢筋及其他补充钢筋满足要求, reentrant corner and other extra reinforcement钢筋表面无片锈、油脂,rebar free of rust, oil, grease传力杆安装满足设计要求,一端刷油, dowel bar installe
5、d properlyConcrete Materials混凝土材料批准的混凝土搅拌站 concrete batch plant approved.批准的混凝土配合比及外加剂,approved concrete proportion and admixture混凝土原材料复检合格报告, concrete material retest submittalForm 模板 模板按设计图纸安装,标高、坡度及直线度合格,form installed as drawing模板钢度符合要求,form is rigid enough模板为钢模,预留传力杆洞,form shall be steel ,with hole punched for dowel模板已校直,平整度满足要求,form be straight模板安装后无缝隙, no any pinholes after form installed按图纸要求设置施工缝预埋件,install the required embedment for jointAcceptance , 验收合格承包商签名: Painting contractor signature业主或业主代表签名: Owner or representative signature时间: Date