1、Technical Scope Engine Requirements / 技术范围发动机要求,0,Remarks备注: Fuel sulfur: aftertreatment protected for 500 ppm 燃油硫: 后处理保护500 ppm,1,42 Mid Wide Cabin Cargo Truck/ 4X2宽体载货车,Engineering Timing Plan Proposal/ 研发进度计划建议,2012,2013,FESO,PESO,Appl. Parts Procurement,DV,RA,LR,Dyno Activities,Vehicle Calibr. A
2、pplic. Tests,AVL Kick Off Meeting,Partial Budget approval,Production DWG Release to JND (*),Special Test,Project kick-off,100% calibration concluded (MWM) 100% 80k km durability concluded (JAC),100% engine durability (dyno) 100% vehicle calibration,Summer, Alt. Calibration, Winter + FFR,2,Combustion
3、 Check,04x retrofits parts dispatch from MWM,16x Proto parts dispatch from JND,04x Retrofit engine (in China),12x engine build,EngineBuilds,JAC - 1x 80kkm Vehicle durability,Application test,NVH / Dur. resonance,PA,Design Freeze,DESIGN,Turbocharger w/ hard tooling,PZD,Drag,TRS,Termalshock,LR,Full bu
4、dget Release,OBD / Emission certification,Technical Scope Engine Requirements / 技术范围发动机要求,3,Remarks备注: Fuel sulfur: aftertreatment protected for 500 ppm 燃油硫: 后处理保护500 ppm,4,HFC 1083 wide HDT 威铃宽体轻卡,Engineering Timing Plan Proposal/ 研发进度计划建议,2012,2012,2013,LR,DV,PA,Tooling and PPAP,Preliminary calibr
5、ation,Engine new application parts design,Engine new part procurement,Vehicle Development tests,Preliminary Sign Off,Vehicle AFT parts design, development & proto procurement,AFT , Diagnosis & EOBD calib.,July/10 SOP,Application parts installation & vehicle build,BE engine #1,#2,#3 -5,# 6-7,Winter calibration,AVL OBD & AFT bench calibration,Vehicle durability,Production Validation,Summer,Dyno Development tests,