1、任务号 任务 负责人 开始时间结束时间 计划天数完成度已用天数剩余天数9/5/119/12/119/19/119/26/1110/3/1110/10/1110/17/1110/24/1110/31/1111/7/1111/14/1111/21/1111/28/1112/5/1112/12/1112/19/1112/26/111/2/121/9/121/16/121/23/121/30/122/6/121 任务1 张三 8/08/11 10/19/11 73 75% 55 181.1 子任务1 8/08/11 8/25/11 18 100% 18 01.2 子任务2 8/26/11 9/04/1
2、1 10 95% 9 11.3 子任务3 9/24/11 10/05/11 12 54% 6 61.4 子任务4 10/06/11 10/20/11 15 50% 7 82 任务2 李四 10/20/11 12/11/11 53 19% 10 432.1 子任务1 10/20/11 11/05/11 17 50% 8 92.2 子任务2 10/20/11 11/05/11 17 30% 5 122.3 子任务3 11/06/11 11/24/11 19 0% 0 192.4 子任务4 11/25/11 12/12/11 18 0% 0 183 任务3 王五 11/24/11 3/01/12 99 0% 0 993.1 子任务1 11/24/11 12/10/11 17 0% 0 173.2 子任务2 12/11/11 12/27/11 17 0% 0 173.3 子任务3 12/28/11 2/02/12 37 0% 0 373.4 子任务4 2/03/12 3/02/12 29 0% 0 29