1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia
2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements
3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the
4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi
5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli
6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar
7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc
8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated
9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc
10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen
11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a
12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and
13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and
14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5
15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu
16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge
17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester
18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.
19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing
20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important “River pig“ resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is hi
21、gh. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million,
22、about 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predict
23、ed that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .4.1 application of the Chinese language application for proxy bidding
24、 agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified locat
25、ion. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the
26、 agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charg
27、es in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to biddin
28、g agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts fo
29、r the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tenderi
30、ng agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the
31、following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with th
32、e General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit
33、not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. C
34、omparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded
35、 in the order. 5th chapter application format notes: bidding agent .有关农村医疗制度的推广现状及成效的论文前言:建立、完善、全面推广新型农村合作医疗,是党中央、国务院落实科学发展观和构建和谐社会的重大决策,是解决三农问题,促进城乡统筹协调发展的重要举措,本研究报告总结合作医疗国际发展和我国的历史经验,根据我长安区的实际情况,借鉴先进经验,从理论分析和实践操作的二方面为实现我区新型农村合作医疗的可持续发展进行理论分析并提出了相应的政策建议。 新型农村合作医疗在经过三年多的发展已经取得很大的成绩。试点工作势头很好,深受广大农民群众
36、欢迎和社会各界的广泛认可。在看到成绩的同时必须支持创新。传统合作医疗曾覆盖 90%以上的农村人口,在保障农民防病、治病方面发挥了重要作用,但后来却大面积解体,要避免重蹈覆辙推广新型农村合作医疗必须进行机制创新,才能实现新型农村合作医疗的可持续发展。对此根据有关资料和现状,我对西安市长安区农村进行调查走访以及调查问卷,结合现实总结以下几个方面。关键词:1. 医疗制度 2. 法规规范机制 3. 资金管理机制 4. 防治并重机制一.调查基本概况我国目前进入了老龄化时期,65 岁以上老年人在人口中的比例已超过 7%,60 岁以上的老年人口已达 1.43 亿,占总人口的 11%,21 世纪中国老龄化有加
37、剧的趋势。我国是典型的未富先老型国家,中国农村的医疗卫生状况令人堪忧,三级医疗网络濒临解体,乡镇卫生院 1/3 基本瘫痪,1/3 仅能维持生计,1/3 能够发展,农民抵御重大疾病灾害的能力十分脆弱。严格的城乡户籍制度造成了我国分明的城乡二元社会结构,城乡居民收入差距甚大,国家对城乡间医疗保障制度的安排也不合理,而城乡居民面对的是统一的药品定价和医疗服务费用,造成了在中国农村普遍存在的因病致贫、因病返贫现象。根据对长安区研究表明,医疗消费在中国农村有着奢侈品的性质,农民对医疗存在着潜在需求,但是受到目前收入水平的制约,医疗需求的满足尚处于从属的地位。有以问卷形式对长安区村庄进行了直接入户方式的调
38、查访问,结果显示,有 79.7%的调查对象反映,他们所在村庄存在农民因病致贫、因病返贫的现象。国家卫生服务调查的结果显示,在中国农村的贫困户中,因病致贫的户数占了很大的比例,该比例在 1998 年和 2003 年分别为 21.61%和 33.4%(卫生First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 applicatio
39、n compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through compliance reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative a
40、nd the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of prof
41、essionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected f
42、or detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 points) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rul
43、es for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 million Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but o
44、ther items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number
45、 of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performance (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency serv
46、ice agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yu
47、an 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects
48、 up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the development and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project servi
49、ng personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation