1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse

2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,

3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8

4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe

5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207

6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo

7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc

8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two “management system“ basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two “management system“ for improvemen

9、t. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management ne

10、twork role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supe

11、rvision of production safety and the Olympic Games and otheractivities, comprehensive and tamping Safety Foundation . Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year complete

12、d the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and techn

13、ological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modific

14、ation of coal mill 5 key technological transformation projects, group health is improved. -Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed m

15、otor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual p

16、roduction output of 0.25%. “Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies“ project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 63

17、0MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the compan

18、y was named “China power information technology benchmarking enterprises.“ -Repair and maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements mainten

19、ance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance,

20、project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-sav

21、ing projects. Second, we should adhere to “three“ on the economic benefits of improving, outreach建设工程施工合同风险防范与控制一、建设工程施工合同风险防范与控制任何一个企业从设立、存续、发展一直到解散,风险无处不在。法律风险也是如此伴随着企业存续的每个阶段。然而,我们在向企业提供诉讼、仲裁法律服务时,深深地感受到绝大多数企业很少在防范法律风险上下功夫,通常将律师、法律顾问当成消防员(代理打官司),要求他们完成“灭火”工作;而对于企业设立、合同签订、变更、履行以及解除、投融资、购并、员工聘用、解聘以

22、及商业秘密保护等重要经营环节,不能主动邀请律师提前介入,结果出现这里刚“灭完火”,那边又“着了火”。如此一来,企业把精力不是放在经营和健康发展上,而是放在 疲于应对各类诉讼、仲裁案件上。建筑施工企业的法律风险主要来源于项目经理部,项目经理部是施工企业最基本的生产经营单位;项目经理部的法律风险常常体现在建设工程施工合同,材料、设备采购合同的签订、履行以及劳动用工、劳务分包等各个方面。而贯穿在项目经理部承包经营活动始终的建筑工程承发包双方的权利义务关系,则主要是通过建设工程施工合同来确定的。由于建筑市场实行的是先定价后成交的期货交易,其远期交割的特性决定了建筑行业的高风险性。因此,尽可能有效地防D

23、elegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assem

24、bly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, s

25、mooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.81

26、5 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No per

27、sonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207

28、million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfor

29、mance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduct

30、ion over the same period a year earlier. Major achievements: first, we should adhere to the two “management system“ basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two “management system“ for improvement

31、. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management net

32、work role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day super

33、vision of production safety and the Olympic Games and otheractivities, comprehensive and tamping Safety Foundation . Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed

34、 the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and techno

35、logical projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modifica

36、tion of coal mill 5 key technological transformation projects, group health is improved. -Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed mo

37、tor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual pr

38、oduction output of 0.25%. “Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies“ project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630

39、MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company

40、 was named “China power information technology benchmarking enterprises.“ -Repair and maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements maintena

41、nce information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, p

42、roject themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-savi

43、ng projects. Second, we should adhere to “three“ on the economic benefits of improving, outreach范和控制建设工程施工合同的法律风险是每个施工企业应该十分重视的问题。本部分包括三个问题:(一)建设工程施工合同风险的主要表现形式(二)建设工程合同风险的分析和对策(三)建设工程施工合同风险防范的措施(一)建设工程施工合同风险的主要表现形式建设工程施工合同风险的客观存在是由合同特殊性、合同履行的不稳定性、长期性、多样性、复杂性以及建筑工程的特点而决定的。 常见的建设工程合同风险分为三类:发包人(业主)资信的

44、风险,外界环境的风险,工程本身涉及工程技术、工程承包价在履行中是赢利还是亏损、索赔和保险等方面的风险。1发包人(业主)的资信风险: 主要是指发包人能否按照合同约定履行自己的义务,包括发包人项目手续的合法性、业主能否按照合同约定支付工程进度款、工程结算款,发包人是否是项目的真正业主以及发包人既往履约情况等等。2外界环境的风险: 实际是建设工程合同的客观风险,包括天灾人祸以及市场波动、国家政策和法律的变化等。如钢材、商品混凝土、沥青等主要材料的市场价格变动;政府、Delegates, staff: Hello! in the run-up to the Spring Festival, we he

45、ld one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power compa

46、nies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business m

47、anagement and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of

48、315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no maj

49、or fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance great

展开阅读全文
相关资源
猜你喜欢
相关搜索
资源标签

当前位置:首页 > 企业管理 > 管理学资料

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:道客多多官方知乎号:道客多多

经营许可证编号: 粤ICP备2021046453号世界地图

道客多多©版权所有2020-2025营业执照举报