1、SH/T 350320071SH/T3503-J304空 冷 式 换 热 器 风 机 安 装检 验 记 录Air Cooled Heat Exchanger FanInstallation Inspection Record工程名称:Project:单元名称:Unit:Description Item No. ModelPlenum Diameter mmBlade Number Belt ModelActual ValueItem Allowable Value 1 2 3 4 5 6Blade Installation Angle,Bland Tip Circumferential Lev
2、el Difference,mmDeviation in Plumbness of FanShaft,mmAxial Deviation in Central Position of Groove for Drive and Driven Shaft Pulley,mmApplied Load W,kNSide Cut Length L,mmBelt TensionCentral Deflection f,mmActual0 45 90 135 180 225 270 315Distance between Inner Wall of Plenum and Tip of Fan Blade,
3、mmNote: Number 1 to 6 in the Column “Actual Value” of this form indicate fan blade numberings. Inspection Conclusion:Owner/Supervision Contractor General Contractor Construction ContractorDiscipline engineer:Date:Discipline engineer:Date:Discipline engineer:Quality inspector:Construction foreman:Date:SH/T 350320072C.4 SH/T3503J304“空冷式换热器风机安装检验记录” , “叶尖圆周水平高低差” ,以一片叶片为基准,测量各叶片尖端上部相对标高差。 “风筒内壁与风扇叶尖间距”记录各叶片尖端部距风筒内壁距离的最小值。 “主、从动轴皮带轮轮槽中心位置轴向偏差”采用拉线法在风机和电机皮带轮外端面处测量。