1、SH/T 3503-J506直流系统/不间断电源(UPS)安装检验记录Inspection Record of DC System and UPS installation工程名称:Project:单元名称:Unit:Description Item No. Construction drawing No.Model Input voltage V ManufactureRated capacity kVA Output voltage V Ex-work No.Inspection items and requirements Result1 Foundation structural st

2、eel have been installed and are acceptable with available installation record.2 Appearance and coating are in good condition; appurtenances, spare parts, operational & special tools and technical documents are complete. 3 Internals in complete and good condition shall be firmly fixed and correctly w

3、ired, identified with complete markings.4 Calibrate the secondary circuit for correct plugs position, agilely operation and reliable access.5 Storage battery is in correct and firm assembly and wiring.6 Complete, firm and reliable cabinet earthing configuration. 7 Electrical equipment adjustment tes

4、t has been inspected and confirmed for acceptance.8 The electrical measuring instruments have been inspected and confirmed for acceptance.9 The storage battery charging and discharging conditions have been inspected and confirmed for acceptance.10 The electrical analog test has been inspected and co

5、nfirmed for acceptance.11 The panel inside shall be kept clean.12 The insulation resistance shall comply with design requirement.Inspection items Allowable deviation Actual deviationVerticality(per meter) 1.5Adjacent tops 2Panel top level deviation mm Tops in line 5Adjacent edges 1Panel face plane d

6、eviationmm Faces in line 5PanelinstallationrecordInter-panel clearance 2Energizing date: Conclusion:Owner/Construction Supervision Contractor General Contractor Construction ContractorDiscipline engineer:Date: Discipline engineer:Date:Discipline engineer:Quality inspector:Construction foreman: Date: E.6 SH/T3503J506“直流系统/不间断电源(UPS)安装检验记录”以系统为单位,每一系统填写一页记录。