1、SH/T 3503-J206整体框架式设备基础允许偏差项目复测记录Frame Type Equipment Foundation Allowable Deviation Item Survey Record工程名称:Project:单元名称:Unit:Foundation Description Item No.Construction Drawing No. Survey Date Actual Deviation of Each Check Point mmS/N Survey Item Tolerance mm 1 2 3 4 5 6 7 8 9 10Foundation 15Separ
2、ate Foundation 101 AxialDisplacementColumn and Beam 85m and below 8Interlevel5m and above 102PlumbnessFull Height H H/1 000and 30Level 103 ElevationFull Height 104 Sectional Dimension 855 Surface Levelness (Checked with 2m ruler) 8Embedded Item 5Embedded Anchor Bolt 26DisplacementofEmbeddedFacilityC
3、enterEmbedded Pipe 37 Displacement of Center of Precast Hole 10Note:H is the full height of the structure.For locations of check points, see the attached sketch.Confirmation on Result of Survey:Take-over Party Owner/Supervision Contractor General Contractor Construction ContractorDiscipline engineer
4、:Date: Discipline engineer:Date:Discipline engineer:Date: Discipline engineer:Quality inspector:Date:SH/T 35032007B.4 SH/T3503J204 “设备基础复测记录 ”中的测量数据为基础整体的定位数据,包括设计坐标和标高。 “复测结果确认”栏由建设/监理单位填写。B.5B.8 设备基础中各部位具体定位数据的记录可根据设备基础形式的不同选用专门的表格填写,包括 SH/T3503J205“块体式设备基础允许偏差项目复测记录” 、SH/T3503J206“整体框架式设备基础允许偏差项目复测记录”、SH/T3503J207“储罐基础允许偏差项目复测记录(一) 、 (二) ”和SH/T3503J208“球罐基础允许偏差项目复测记录”等。此类表格作为土建施工单位即表中“施工单位”在设备基础施工完毕并符合质量要求后,交付安装单位即表中“接收单位”的用表,表格中的“复测结果确认”栏由建设/监理单位填写并签认。