1、SH/T 3503-J205块体式设备基础允许偏差项目复测记录Block Type Equipment Foundation Allowable Deviation Item Survey Record工程名称:Project:单元名称:Unit:Foundation Description Item No.Construction Drawing No. Survey DateActual Deviation of Each Check Point mmS/N Survey Item Tolerance mm 1 2 3 4 5 6 7 8 9 101 Longitudinal 202 Ax
2、ial Position Horizontal 203 Elevations of Different Levels of Foundation 020Geometrical Dimension of Foundation 20Geometrical Dimension of Foundations Convex Section 0204Dimension of Foundations Concave Section (Incl. internal holes, ditches and pits)200Every Meter 55Foundation Surface Levelness ( I
3、ncluding the part on the grade where equipment is to be installed) Full Length 10Every Meter 56 Lateral Foundation Plumbness Full Length 10Elevation (Top) 10 07 Embedded Anchor Bolt Central Distance (between the top and the bottom)2Central Position 10Depth 20 08Precast Hole For Anchor Bolt Hole Wall
4、 Plumbness 10Elevation 20 0Central Position 5Anchor Plate with Notch 59Embedded Removable Anchor Plate for Anchor Bolt Levelness Anchor plate with Threaded Hole 2Confirmation on Result of Survey (For locations of check points, see the attached sketch):Take-over Party Owner/Supervision Contractor Gen
5、eral Contractor Construction ContractorSH/T 35032007Discipline engineer:Date: Discipline engineer:Date:Discipline engineer:Date: Discipline engineer:Quality inspector:Date:B.4 SH/T3503J204 “设备基础复测记录 ”中的测量数据为基础整体的定位数据,包括设计坐标和标高。 “复测结果确认”栏由建设/监理单位填写。B.5B.8 设备基础中各部位具体定位数据的记录可根据设备基础形式的不同选用专门的表格填写,包括 SH/T3503J205“块体式设备基础允许偏差项目复测记录” 、SH/T3503J206“整体框架式设备基础允许偏差项目复测记录”、SH/T3503J207“储罐基础允许偏差项目复测记录(一) 、 (二) ”和SH/T3503J208“球罐基础允许偏差项目复测记录”等。此类表格作为土建施工单位即表中“施工单位”在设备基础施工完毕并符合质量要求后,交付安装单位即表中“接收单位”的用表,表格中的“复测结果确认”栏由建设/监理单位填写并签认。