1、部门名称的专有名词QS:Quality system 品质系统CS:Coutomer Sevice 客户服务QC:Quality control 品质管理IQC:Incoming quality control 进料检验LQC:Line Quality Control 生产线品质控制IPQC:In process quality control 制程检验FQC:Final quality control 最终检验OQC:Outgoing quality control 出货检验QA:Quality assurance 品质保证 SQA:Source(supplier) Quality Assu
2、rance 供应商品质保证(VQA)CQA:Customer Quality Assurance 客户质量保证PQA rocess Quality Assurance 制程品质保证QE:Quality engineer 品质工程CE:component engineering 零件工程EE:equipment engineering 设备工程ME:manufacturing engineering 制造工程TE:testing engineering 测试工程PPE roduct Engineer 产品工程IE:Industrial engineer 工业工程ADM: Administrati
3、on Department 行政部RMA:客户退回维修CSDI:检修PC:producing control 生管MC:mater control 物管GAD: General Affairs Dept 总务部A/D: Accountant /Finance Dept 会计LAB: Laboratory 实验室DOE:实验设计HR:人资PMC:企划RD:研发W/H:仓库SI:客验PD: Product Department 生产部PA:采购 (PUR: Purchaing Dept)SMT:Surface mount technology 表面粘着技术MFG:Manufacturing 制造M
4、IS:Management information system 资迅管理系统DCC:document control center 文件管制中心厂内作业中的专有名词QT:Quality target 品质目标QP:Quality policy 目标方针QI:Quality improvement 品质改善CRITICAL DEFECT:严重缺点(CR)MAJOR DEFECT:主要缺点(MA )MINOR DEFECT:次要缺点(MI)MAX:Maximum 最大值MIN:Minimum 最小值DIA iameter 直径DIM imension 尺寸LCL:Lower control li
5、mit 管制下限UCL:Upper control limit 管制上限CPI:Continuous Process Improvement 连续工序改善Compatibility:兼容性Marking:标记DWG rawing 图面Standardization:标准化Consensus:一致Code:代码ZD:Zero defect 零缺点Tolerance:公差Subject matter:主要事项Auditor:审核员BOM:Bill of material 物料清单Rework:重工ID: identification 识别,鉴别, 证明PILOT RUN: (试投产)FAI:首件检
6、查FPIR:First Piece Inspection Report 首件检查报告FAA:首件确认SPC:统计制程管制CP: capability index(准确度)CPK: capability index of process(制程能力)PMP:制程管理计划(生产管制计划)MPI:制程分析DAS efects Analysis System 缺陷分析系统PPB:十亿分之一L/N:Lot Number 批号Version:版本Quantity:数量Valid date:有效日期MO: Manafacture Order 生产单TQM:Total quality control 全面品质管
7、理MDA:manufacturing defect analysis 制程不良分析 (ICT)DPPM: Defect Part Per Million (不良率的一种表达方式:百万分之一) 1000PPM 即为 0.1%Corrective Action: (CAR 改善对策)ACC:允收REJ:拒收S/S:Sample size 抽样检验样本大小SI-SIV:Special I-Special IV 特殊抽样水平等级ISO:国际标准化组织ISA:Industry Standard Architecture 工业标准体制结构PDCA:管理循环Plan do check action 计划,执
8、行,检查,总结WIP:在制品(半成品)AQL:acceptable quality level 允收品质水准LQL;Limiting quality level 最低品质水准QVL:qualified vendor list 合格供应商名册AVL :认可的供货商清单(Approved Vendor List)QCD: Quality cost delivery(品质,交期,成本)KPI:Key performance indicate 重要绩效指标MVT:Manufacturing Verification Test 制造验证试产Q/R/S:Quality/Reliability/Servic
9、e 质量/可靠度/服务NTF:No trouble found 误判CIP:capacity improvement plan(产能改善计划)MRB:material review board(物料审核小组)MRB:Material reject bill 退货单JIT:just in time(即时管理)5S:seiri seiton seiso seiketsu shitsuke(整理,整顿,清扫,清洁,修养)SOP:standard operation process(标准作业程序)SIP:Specification inspection process 制程检验规格TOP: Test
10、Operation Process (测试作业流程)WI: working instruction(作业指导书)FAR:failure aualysis report 故障分析报告CAR:Corrective action report 改善报告ISAR :首批样品认可(Initial Sample Approval Request)-QCC :品管圈 (Quality Control Circle)Engineering Department (工程部)TQEM: Total Quality Environment Management(全面品质环境管理)PD: Production Dep
11、artment (制造)AOQ:Average Output Quality 平均出货质量AOQL:Average Output Quality Level 平均出货质量水平FMEA:failure model effectiveness analysis 失效模式分析CRB: Change Review Board (工程变更会议)CSA:Customer Simulate Analysis 客户模拟分析SQMS:Supplier Quality Management System 供应商品质管理系统QIT: Quality Improvement Team 品质改善小组QIP:Qualit
12、y Improvement Plan 品质改善计划CIP:Continual Improvement Plan 持续改善计划M.Q.F.S: Material Quality Feedback Sheet (来料品质回馈单)SCAR: Supplier Corrective Action Report (供货商改善对策报告)8D Sheet: 8 Disciplines sheet ( 8D 单)PDCA:PDCA (Plan-Do-Check-Action) (管理循环 )MPQ: Material Packing Quantity (物料最小包装量)DSCN: Delivery Sched
13、ule Change Notice (交期变更通知 )QAPS: Quality Assurance Process Sheet (品质工程表)DRP :运销资源计划 (Distribution Resource Planning)DSS:决策支持系统 (Decision Support System)EIS :主管决策系统 (Excutive Information System) :企业资源规划 (Enterprise Resource Planning)FMS :弹性制造系统 (Flexible Manufacture System)KM :知识管理 (Knowledge Managem
14、ent)4L :逐批订购法 (Lot-for-Lot)LTC :最小总成本法 (Least Total Cost)LUC :最小单位成本 (Least Unit Cost)MES :制造执行系统 (Manufacturing Execution System)MPS :主生产排程 (Master Production Schedule)MRP :物料需求规划 (Material Requirement Planning)MRP:制造资源计划 (Manufacturing Resource Planning)OEM :委托代工 (Original Equipment Manufacture)OD
15、M :委托设计与制造 (Original Design & Manufacture)OLAP:线上分析处理 (On-Line Analytical Processing)OLTP:线上交易处理 (On-Line Transaction Processing)OPT :最佳生产技术 (Optimized Production Technology)PDCA:PDCA 管理循环 (Plan-Do-Check-Action)PDM:产品数据管理系统 (Product Data Management)RCCP:粗略产能规划 (Rough Cut Capacity Planning)SCM :供应链管理
16、 (Supply Chain Management)SFC :现场控制 (Shop Floor Control)TOC:限制理论 (Theory of Constraints)TQC :全面品质管制 (Total Quality Control)S/T:Standard time 标准时间TPM:total production maintenance:全面生产保养IT:information technology 信息技术,资讯科学CEO:Chief Executive Officer 执行总裁COO: Chief Operaring Officer 首席业务总裁SWOT:Strength,
17、Weakness,Opportunity,Threat优势弱点 机会 威胁Competence:专业能力Communication:有效沟通IDP:Individual Development Plan 个人发展计划MRP:Material Requirement Planning 物料需求计划MATS:Material 材料LRR:Lot Rejeet Rate 批退率ATIN:Attention 知会5W1H:When , Where , Who , What , Why , Ho5M: Man , Machine , Material , Method , Measurement人,机器,材料, 方法,测量4MIE: Man,Material,Machine,Method,Environment人力,物力,财务, 技术,时间(资源)7M1I: Manpower , Machine , Material , Method, Market , Management , Money , Information人力, 机器, 材料, 方法, 市场, 管理, 资金, 资讯Pre-Inspection Area待检区