1、The Bidding Documents forICB Procurement of Mechanic In the event of any discrepancies between them, the Chinese version shall govern.Bidding Price and Currency11.11. The former forms of Bid Schedules of Price as IV-3-12. The new forms of the Bid Schedules of Price are shown as Attach 2-a otherwise,
2、 the offer on such items shall not be deducted during the evaluation. Also, the total bid price shall not omit any item required in the bidding document; otherwise, the highest offer of the same item among the effective bids shall be added to the total bid price. The tendering this time shall not ac
3、cept selective price in any form or price with additional conditions.11.2.1For goods offered from within P.R. China:Terms of the Bidding Price: Project Site Price incl. VAT and other taxes.Related Fees: the price for Inland transportation, insurance, other local costs incidental to delivery of the g
4、oods to their final destination and other incidental services should be quoted separately.1. The bid price shall include the cost of equipments installation and commissioning. The Seller shall be responsible for all equipments installation and commissioning.2 Bidders shall quote the itemized prices
5、in strict accordance with the form of Attach 1 Bid Schedules of Price The prices shall be quoted in USD or EUR for goods and services that the Bidder will supply from outside P.R.C. Any statement of exchange rate variation will not be accepted in the bid opening, the exchange middle rate published b
6、y Bank of China on the date of bid opening will be taken as the basis of the bid evaluation, USD will be the bid evaluation currency.The Preparation and Submission of Bidding Documents13.1The Bidder shall furnish, as part of its bid, documents establishing the Bidders eligibility to bid and its qual
7、ifications to perform the contract if its bid is accepted. If Bidders are a Joint Venture, each member of the Joint Venture shall submit respectively the Qualification Documents, together with the Joint Venture Agreement in which the leading member of the Joint Venture and respective work scope and
8、responsibility shall be clearly indicated. Otherwise, the bid will be rejected. 13.3Qualifications requirements for suppliers1 Seller shall manufacture Engine plant Assembly Line machine for more than five (5) years. (2006-2010)2 Seller shall have sales contracts with an engine plant with annual pro
9、duction capacity over 150,000. (Copies of sales contracts with bidders official seal to be provided.). 3. Bidder(s) shall not have harmful record in the field of car and banking industries.4. Bidder(s) shall provide the following qualification documents.1) In case that the goods to be supplied under
10、 the contract not manufactured or produced by the bidder, the Bidder should have been duly authorized by the Section 6 Bid Data Sheet (BDS)6-4Item No. Contentgoods Manufacturer or Producer for this project;2) The Bidder has the financial, technical and productive capability necessary to perform the
11、contract;3) The Bidder meets the qualification and experience criteria listed in the Bid Data Sheet;4) The Bidder shall provide the original or the duplicate of the bank reference letter issued within three months prior to the time of bid opening;5) Other documentary evidence of the Bidders qualific
12、ations required in the bidding document. 14.3The documentary evidence of the conformity of the goods and services to the Bidding Documents may be in the form of literature, drawing and data, and shall consist of:1. Detailed description of the essential technical and performance characteristics of th
13、e goods; and2. A list of spare parts and special tools, giving full particulars, including available sources and current prices of spare parts, special tools; and3. Instruction for installation, commissioning, and technical services as well as training (if any), project schedule, plan and content et
14、c. at sellers responsibilities; and make a explicit for the package and the transportation; and4. The bidder shall fill in the commercial and technical deviation forms item by item; the Tendering Agent and Tenderee will regard the bid documents in compliance with the Tendering Documents if no conten
15、t are listed; and5. A list of sub-contractors and manufacturers and statement of origin. 15.1 Amount of Bid Security: Not less than two percent (2%) of Bid Price.15.3Forms of Bid Security: Bid Security in form of Bank Guarantee/Bond (see attached for BITCs banking information)Requirements for Bid Se
16、curity in Guarantee/Bond:1. The Bid Guarantee/Bond from banks abroad must be advised or transmitted or reissued or have its signature verified by the Bank of China, Head Office, Beijing, China or its oversea branch; and that issued from domestic provincial of higher level banks must be printed with
17、the banks name, address and communication method.2. The validity of the bid security: Thirty (30) days after the bid validity.16.1 Bidding Period of Validity: Ninety (90) days17.1Number of Original: One (1) Copies: 6 of the writing Bid(Two (2) copies of electronic version including all contents of t
18、he Bid as well as technical Annex) 17.2 The bidder shall make their bid effectually be signed according to the provisions of the Bidding Documents.18.1Any special statement of price reducing should be submitted with Summary Sheet for Bid Opening together with Bid Security and Payment Guarantee for B
19、idding Service Charge in a separately sealed envelop to the Tendering Agent Section 6 Bid Data Sheet (BDS)6-5Item No. Contenton Bidding Opening Date. Otherwise, the document will not be acknowledged in bid evaluation.18.2.1Bidding document should be submitted to: Place to be informed laterInvitation
20、 for Bids Title and No.: 0610-1140BJIH1032/1 19.1 Deadline for Bid Submission: 9:30 (Beijing Time) on Mar.8th, 201122.1Date for Bid Opening: Mar.8th, 2011Time for Bid Opening: 9 :30 (Beijing Time)Place for Bid Opening: Place to be informed laterBid Evaluation23.1 Bid evaluation principle: the lowest
21、 evaluated price leads to a bid success.24.5The bid that will be rejected: The bid that is not substantially responsive will be rejected:The bid will be rejected as non-responsive, if it is found having any of the following during the commercial evaluation:1) The bid is not accompanied with a bid se
22、curity, or in the case the submitted bid security is of less amount than required, or of shorter validity than required, or not conforming with the requirements of Bidding Documents in its form and issuing bank.2) The Quotation part, responses to general commercial and technical clauses and provisio
23、ns, and responses to important commercial and technical clauses and provisions (marked with ) and all the content in Section IV of Volume One shall be initialed and signed page by page.3) The bidder and the manufacturer have interest with the Tender and or the Tendering Agent.4) The bid form or qual
24、ification Documents are not submitted or not in compliance with the requirements of the bidding document.5) The bid has not been signed by the Bidders legal representative or by the person or persons with a power of attorney issued by the said Legal Representative.6) The experience of the bidder doe
25、s not meet the requirements of the Bidding Documents.7) The bid validity offered by the Bidder is shorter than that stipulated in the bidding documents and 8) The bid does not meet, in commercial aspects, other clauses stipulated in the bidding documents.26.2 The total Evaluated Bid Price (EBP) will
26、 be calculated on the basis that the goods are delivered to the designated installation site.For goods offered outside PRC, the total EBP shall be: CIF Price, plus Customs Duties, Import Taxes, and the cost of Inland Transportation and Insurance.For goods offered from within PRC, the total EBP shall
27、 be: EXW Price Section 6 Bid Data Sheet (BDS)6-6Item No. Content(including Value Added Tax and other taxes), plus the cost of Inland Transportation and Insurance.26.3 Factors Quantified for Bid Evaluation: 26.3 1), 2), 3), 4), 6),7), 8)26.4 .1Project Site: Tongzhou District Beijing, P. R. ChinaBidde
28、r should furni The followings should be supplied by the Bidders: Cost of Inland transportation, insurance, other local costs for delivery of the goods to their final destination and other incidental services should be quoted separately:Estimated dimension and shipping weight should be provided.26.4.
29、2 Delivery Time: see Section 8 Option selected: 26.4.2 1) 26.4.3Deviation in Payment Schedule:Option selected: 26.4.3 2) Annual Interest Rate: 10%.If not accepting the payment schedule, the bidder should submit his proposal of payment schedule and corresponding depreciation scheme, the Tendering Age
30、nt reserves the right to maintain the original payment schedule.26.4.4Cost of Components and Spare Parts.Option selected: 26.4.4.1) Description of renewal parts shipped with machines and spare parts, unit prices and quantities shall be quoted in the technical document. The total prices of those item
31、s based at the unit prices shall be included in the total bid quotation or the max price of other bidding documents of the components and spare parts will be added to the total bid price for bid evaluation. Spare parts will be amount of 2% of total contract price and unit description, price and quan
32、tity shall be attached. Bidders shall guarantee that prices of components and spare parts offered to the buyer in the next five years should not be higher than prices in the bidders document.26.4.5Spare parts and after-sale service facilities in the purchasers country: 1) Seller shall have maintenan
33、ce station and spare parts stock, and special maintenance personnel in Mainland China. The total amount of stock and a list of spare parts shall be attached. Seller shall quote corresponding after-sale services project and relevant fees if maintenance station is not available, and relevant expenses
34、will be taken into consideration for bid evaluation, or one percent of bid price will be added to bid evaluation price if sellers do not quote such expense;2) Seller shall guarantee comprehensive after-sale services so that spare parts will be available for the entire year. Seller shall reply to buy
35、ers request within four hours and relevant services and spare parts will be available within twenty-four hours after request, otherwise one percent of bid price will be added for bid evaluation. 3)Sellers maintenance station in Mainland China shall provide qualified Section 6 Bid Data Sheet (BDS)6-7
36、Item No. Contentafter-sale services including proper components stock, experienced special maintenance personnel and etc. in order to meet the bid commoditys normal running.26.4.6 Not applicable26.4.7Performance and productivity of equipment: Option selected: 26.4.7.1) 1%Bidder shall state its guara
37、nteed performance or productivity in response to Requirements of Technical Specification. 26.4.8Other Additional Factors and Criteria for Bid Evaluation: 1. Any deviation to the key technical clauses (marked with “”) in Section VIII will lead to rejection of the bid. Bidders shall furnish technical
38、documentary evidence to validate the conformity of offered goods and service to key technical clauses; otherwise the bid shall be rejected, and no clarification or supplementation in any form shall be accepted. 2. Any deviation to the key commercial clauses (marked with “”) will lead to rejection of
39、 the bid. (including but not limited to the following items)(1) The eligibility of the bidder shall meet the requirement of Clause 2.2 in ITB and Clause 13.3 in Section 6.(2)The bidder shall meet the requirement of Clause 10.1 in ITB.3. The bidder shall declare no additional item beyond the scope of
40、 supply required in Bidding documents is included in his quotation. Otherwise the price of these additional items, if any, shall not be deducted from the evaluation price.4. For each deviation to general technical clause, 1% of the bid price will be added to the evaluation price; in case over 10 gen
41、eral technical clauses are deviated, the bid will be rejected; Failure to respond to specifications/requirements specified in the tendering documents shall be deemed as failure to meet the requirements; the scope of supply shall be in accordance with the requirement of the bidding documents; in case
42、 any required item is missed or omitted, the highest price of such item among other valid bids will be added to the evaluation price.5. If the bidder provides two or above bidding proposals, the bid evaluation committee shall only evaluate the main proposal. The alternative proposal may be taken int
43、o consideration only if the main proposal is accepted;. In the mean time, the alternative proposal shall materially meet requirements of the bidding document, and the bid price of the alternative proposal shall not exceed that of the main proposal. The bid shall be rejected in case the main proposal
44、 is not indicated.6. The bidder shall respond to the technical clauses in Section 8 item by item, otherwise the bid shall be rejected.7. Deviations in the supply of equipment and services:Section 6 Bid Data Sheet (BDS)6-8Item No. ContentThe highest itemized quotation among the eligible bids will be
45、applied to adjust the bid price provided that the bidder has not furnished a complete supply of equipment and services according to the requirements for supply.8. The additional expenses for the goods, services, and engineering facilities etc. to be supplied by buyer or the third party will be estim
46、ated to adjust the bid price according to the market price.Section 6 Bid Data Sheet (BDS)6-936.1The bid awarding party shall pay the Tendering Agent the service charge as per the following:1) 0.35% ( zero point six percent) of total contract price, as the service charge should be charged in an amoun
47、t with the total amount of money in the Notification of Award as the calculation base; 2) The bidder shall submit the Summary Sheet for Bid Opening together with the Payment Guarantee for Bidding Service Charge(see Annex 11)and the Bid Security, in a separately sealed envelop to the Tendering Agent
48、on the Bidding Opening Date;3) Payment of bidding service charge: The service charge will be deducted directly in case bid security submitted in form of Bank Demand Draft (D/D), Cheque. The Bid Security of the losing party and the balance remained of the winning party will be returned not later than
49、 30 days after expiration of the bid validity. Or it shall be paid by cheque, or bill of exchange, or telegraphic transfer, directly to the Tendering Agent within 15 days after the signature of contract, according to the stipulations mentioned above in case the Bid Security is submitted in Bank Guarantee.4) The bidder shall submit the Payment Guarantee for Bidding Service Charge(see Annex 11)together with the biding document.Section 6 Bid Data Sheet (BDS)6-10Contract Award1The Tenderee reserves the right at the time of contract award to increase or decrease, by not mo