收藏 分享(赏)

路基类施工用表.doc

上传人:精品资料 文档编号:7590210 上传时间:2019-05-21 格式:DOC 页数:56 大小:798.50KB
下载 相关 举报
路基类施工用表.doc_第1页
第1页 / 共56页
路基类施工用表.doc_第2页
第2页 / 共56页
路基类施工用表.doc_第3页
第3页 / 共56页
路基类施工用表.doc_第4页
第4页 / 共56页
路基类施工用表.doc_第5页
第5页 / 共56页
点击查看更多>>
资源描述

1、measures planned implementation of technical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection meas

2、ures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approve

3、d by the factory (company), workshop and team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production technology section recovery archive, and reported to the company trade unions, safety record

4、. Training and examinations including the safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The 39th article: new producers must receive the following training and qualified posts: (a

5、) the operating personnel, scheduling, must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, technical specifications for learning and class practice; (C) special operations personne

6、l, must pass the national professional training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regularly carry out targeted of technical questions and answers, an accident expected on site

7、 training and anti-accident; (B) from running post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examination. The 42nd article: June of every year once regulatory and safety procedures of the c

8、ompany system of examinations, examination the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the examination, as a formal announcement are eligible to work as ticket issuer, head of ins

9、pection, work permits and the right to a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they can post. 44th: for breach of discipline system caused the accident, a kind of disorder an

10、d attempted serious responsibility for the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Article 45th: units of the company using the security video, slide projector, television, co

11、mputer, multimedia, radio, Billboard, artifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted, Visual training, enhancing workers safety awareness and self-protection ability. Article

12、 46thregular issuance system of internal and external accident cases, organizational learning, analysis and discussion on a regular basis, and educate the persons concerned in a timely manner. 47th article: strengthening the safety of staff, establishing the concept of legalization of production saf

13、ety, establish a “people-oriented“ concept, “three do no harm“ (dont hurt yourself, no harm to others, not to be hurt). 48th eighth day routine: pre-shift and post-shift monitor organizations, safety assist. Before class: succession (started), combined with shift operation and tasks for better risk

14、analysis, arranged security account considerations. After class: summarizing comment on duty and the security situation, praise good deeds criticism ignored safety, illegal operations and other adverse phenomena, and completes the record. 49th: safety day event organized by the monitor, safety help,

15、 workshop leaders and checking activities. Classes (groups) or rotating a safety day event a week, activities to learn more about the superior file and the spirit of the meeting, informed of the accident, analysis of the company, workshop and fewer security incidents, as well as the typical illegal

16、team, analysis of operation environment, there may be a risk factor for the main content. 50th: security analysis companies every quarter of a security analysis; shop at least once a month analysis, comprehensive analysis of production trends, sum up lessons learned from and the weakness in safety m

17、anagement, accident prevention measures in the study. Meeting was chaired by enterprise security responsibility, concerning the participation of Heads of Department, workshop. Formation meeting and made public. 51st: security check for carbon companys periodic and non-periodic safety checks should b

18、e carried out. Periodic inspection includes fall and spring security checks, security checks should be combined with spring or autumn season characteristics and accident law . 52nd: security analysis companies should all be actively involved in the preparation of security advisories, bulletins, inte

19、grated security, analysis of accident law, drawing on lessons learned from. 53rd: the companys safety safety month activities each year according to the Governments requirements and deployment of the group, safety month activities focus on advocacy efforts to improve production safety and strengthen

20、 company-wide awareness of work safety, improve the safety awareness, improving the companys safety culture. 54th: units of the company in relation to the units actual, active use of “risk analysis“ method, and is actively exploring new management tools for enterprises and job site safety analysis,

21、identify weaknesses and potential accidents and take preventive measures in a timely manner. 55th: units of the company against the possibility of seriously affecting the safety of emergency contingency plans, and actively prepared for the critical work, ensure that the critical situation occurred a

22、fter relief, rescue and recovery work in an orderly manner. 56th Nineth day construction project: company or project, the implementation of construction projects legal and construction team joint management of construction site safety of principle. Identified under the project bear this organizing,

23、coordinating and oversight responsibilities;二、路基类用表目录(52 种)序号 表格名称 表号1 路基填筑前地面处理检查表 路 01 表2 路基标高检查表 路 02 表3 路基(路面)宽度、横坡、边坡检查表 路 03 表4 路基、路面平整度检查表 路 04 表5 中线(轴线)偏位检查记录表 路 05 表6 路基、路面压实度汇总表 路 06 表7 弯沉测定记录表 路 07 表8 路基、路面弯沉检测计算表 路 08 表9 路基路面弯沉汇总表 路 09 表10 冲击压实施工检查表 路 10 表11 强夯施工记录表 路 11 表12 路基路面填料虚铺厚度检查

24、记录表 路 12 表13 路基填料沉降量检查表 路 13 表14 加筋、隔离、过滤排水、防裂工程土工合成 材料检查记录表 路 14 表15 砂桩、碎石桩、粉喷桩检查表 路 15 表16 袋装砂井、塑料排水板软土地基处治检查表 路 16 表17 水泥混凝土路面检查表 路 17 表18 路面结构层厚度检查表 路 18 表19 水泥稳定粒料基层、底基层检查表 路 19 表20 水泥土基层、底基层检查表 路 20 表21 石灰土基层、底基层检查表 路 21 表22 路肩检查表 路 22 表23 路缘石铺设检查表 路 23 表measures planned implementation of tech

25、nical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection measures planned in implementation of measu

26、res against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approved by the factory (company), workshop an

27、d team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production technology section recovery archive, and reported to the company trade unions, safety record. Training and examinations including t

28、he safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The 39th article: new producers must receive the following training and qualified posts: (a) the operating personnel, scheduling,

29、must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, technical specifications for learning and class practice; (C) special operations personnel, must pass the national professional

30、training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regularly carry out targeted of technical questions and answers, an accident expected on site training and anti-accident; (B) from r

31、unning post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examination. The 42nd article: June of every year once regulatory and safety procedures of the company system of examinations, examinat

32、ion the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the examination, as a formal announcement are eligible to work as ticket issuer, head of inspection, work permits and the right to

33、a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they can post. 44th: for breach of discipline system caused the accident, a kind of disorder and attempted serious responsibility for

34、the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Article 45th: units of the company using the security video, slide projector, television, computer, multimedia, radio, Billboard, a

35、rtifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted, Visual training, enhancing workers safety awareness and self-protection ability. Article 46thregular issuance system of interna

36、l and external accident cases, organizational learning, analysis and discussion on a regular basis, and educate the persons concerned in a timely manner. 47th article: strengthening the safety of staff, establishing the concept of legalization of production safety, establish a “people-oriented“ conc

37、ept, “three do no harm“ (dont hurt yourself, no harm to others, not to be hurt). 48th eighth day routine: pre-shift and post-shift monitor organizations, safety assist. Before class: succession (started), combined with shift operation and tasks for better risk analysis, arranged security account con

38、siderations. After class: summarizing comment on duty and the security situation, praise good deeds criticism ignored safety, illegal operations and other adverse phenomena, and completes the record. 49th: safety day event organized by the monitor, safety help, workshop leaders and checking activiti

39、es. Classes (groups) or rotating a safety day event a week, activities to learn more about the superior file and the spirit of the meeting, informed of the accident, analysis of the company, workshop and fewer security incidents, as well as the typical illegal team, analysis of operation environment

40、, there may be a risk factor for the main content. 50th: security analysis companies every quarter of a security analysis; shop at least once a month analysis, comprehensive analysis of production trends, sum up lessons learned from and the weakness in safety management, accident prevention measures

41、 in the study. Meeting was chaired by enterprise security responsibility, concerning the participation of Heads of Department, workshop. Formation meeting and made public. 51st: security check for carbon companys periodic and non-periodic safety checks should be carried out. Periodic inspection incl

42、udes fall and spring security checks, security checks should be combined with spring or autumn season characteristics and accident law . 52nd: security analysis companies should all be actively involved in the preparation of security advisories, bulletins, integrated security, analysis of accident l

43、aw, drawing on lessons learned from. 53rd: the companys safety safety month activities each year according to the Governments requirements and deployment of the group, safety month activities focus on advocacy efforts to improve production safety and strengthen company-wide awareness of work safety,

44、 improve the safety awareness, improving the companys safety culture. 54th: units of the company in relation to the units actual, active use of “risk analysis“ method, and is actively exploring new management tools for enterprises and job site safety analysis, identify weaknesses and potential accid

45、ents and take preventive measures in a timely manner. 55th: units of the company against the possibility of seriously affecting the safety of emergency contingency plans, and actively prepared for the critical work, ensure that the critical situation occurred after relief, rescue and recovery work i

46、n an orderly manner. 56th Nineth day construction project: company or project, the implementation of construction projects legal and construction team joint management of construction site safety of principle. Identified under the project bear this organizing, coordinating and oversight responsibili

47、ties;24 涵洞、通道总体检查表 路 24 表25 盖板涵(通道)检查表 路 25 表26 箱涵(通道)检查表 路 26 表27 圆管涵检查表 路 27 表28 倒虹吸管检查表 路 28 表29 拱涵检查表 路 29 表30 锥、护坡检查表 路 30 表31 一字墙、八字墙检查表 路 31 表32 墙、涵、台背回填压实检查表 路 32 表33 急流槽、跌水、水簸箕检查表 路 33 表34 干砌、浆砌砌体检查表 路 34 表35 排水结构物检查表 路 35 表36 盲沟检查表 路 36 表37 小型预制构件检查表 路 37 表38 检查(雨水)井砌筑检查表 路 38 表39 挂网喷浆防护检查

48、表 路 39 表40 锚固(抗滑)桩灌注砼前检查表 路 40 表41 锚固(抗滑)桩成桩检查 路 41 表42 锚索孔质量检查表 路 42 表43 锚索安装检查表 路 43 表44 锚索地梁浇筑砼检查表 路 44 表45 防护工程面板预制检查表 路 45 表46 管节预制检查表 路 46 表47 管道基础及管节安装检查表 路 47 表48 排水管安装检查表 路 48 表49 面板安装检查表 路 49 表50 干砌、浆砌挡土墙检查表 路 50 表51 灰土挤密桩施工检查表 路 51 表52 软土地基处治检查表 路 52 表measures planned implementation of te

49、chnical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection measures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approved by the factory (c

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 企业管理 > 管理学资料

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:道客多多官方知乎号:道客多多

经营许可证编号: 粤ICP备2021046453号世界地图

道客多多©版权所有2020-2025营业执照举报