1、measures planned implementation of technical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection meas
2、ures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approve
3、d by the factory (company), workshop and team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production technology section recovery archive, and reported to the company trade unions, safety record
4、. Training and examinations including the safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The 39th article: new producers must receive the following training and qualified posts: (a
5、) the operating personnel, scheduling, must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, technical specifications for learning and class practice; (C) special operations personne
6、l, must pass the national professional training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regularly carry out targeted of technical questions and answers, an accident expected on site
7、 training and anti-accident; (B) from running post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examination. The 42nd article: June of every year once regulatory and safety procedures of the c
8、ompany system of examinations, examination the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the examination, as a formal announcement are eligible to work as ticket issuer, head of ins
9、pection, work permits and the right to a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they can post. 44th: for breach of discipline system caused the accident, a kind of disorder an
10、d attempted serious responsibility for the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Article 45th: units of the company using the security video, slide projector, television, co
11、mputer, multimedia, radio, Billboard, artifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted, Visual training, enhancing workers safety awareness and self-protection ability. Article
12、 46thregular issuance system of internal and external accident cases, organizational learning, analysis and discussion on a regular basis, and educate the persons concerned in a timely manner. 47th article: strengthening the safety of staff, establishing the concept of legalization of production saf
13、ety, establish a “people-oriented“ concept, “three do no harm“ (dont hurt yourself, no harm to others, not to be hurt). 48th eighth day routine: pre-shift and post-shift monitor organizations, safety assist. Before class: succession (started), combined with shift operation and tasks for better risk
14、analysis, arranged security account considerations. After class: summarizing comment on duty and the security situation, praise good deeds criticism ignored safety, illegal operations and other adverse phenomena, and completes the record. 49th: safety day event organized by the monitor, safety help,
15、 workshop leaders and checking activities. Classes (groups) or rotating a safety day event a week, activities to learn more about the superior file and the spirit of the meeting, informed of the accident, analysis of the company, workshop and fewer security incidents, as well as the typical illegal
16、team, analysis of operation environment, there may be a risk factor for the main content. 50th: security analysis companies every quarter of a security analysis; shop at least once a month analysis, comprehensive analysis of production trends, sum up lessons learned from and the weakness in safety m
17、anagement, accident prevention measures in the study. Meeting was chaired by enterprise security responsibility, concerning the participation of Heads of Department, workshop. Formation meeting and made public. 51st: security check for carbon companys periodic and non-periodic safety checks should b
18、e carried out. Periodic inspection includes fall and spring security checks, security checks should be combined with spring or autumn season characteristics and accident law . 52nd: security analysis companies should all be actively involved in the preparation of security advisories, bulletins, inte
19、grated security, analysis of accident law, drawing on lessons learned from. 53rd: the companys safety safety month activities each year according to the Governments requirements and deployment of the group, safety month activities focus on advocacy efforts to improve production safety and strengthen
20、 company-wide awareness of work safety, improve the safety awareness, improving the companys safety culture. 54th: units of the company in relation to the units actual, active use of “risk analysis“ method, and is actively exploring new management tools for enterprises and job site safety analysis,
21、identify weaknesses and potential accidents and take preventive measures in a timely manner. 55th: units of the company against the possibility of seriously affecting the safety of emergency contingency plans, and actively prepared for the critical work, ensure that the critical situation occurred a
22、fter relief, rescue and recovery work in an orderly manner. 56th Nineth day construction project: company or project, the implementation of construction projects legal and construction team joint management of construction site safety of principle. Identified under the project bear this organizing,
23、coordinating and oversight responsibilities;施工质量验收技术资料通用表施工技术交底记录A.0.19工程名称 朱雀云天项目 3#楼 交底日期 2014 年 8 月 1 日交底项目 粉刷工程 工程部位 1-12 层粉刷交底提要 粉刷施工工艺及方法内容:1、施工准备1.1 技术准备在整个抹灰工程施工前,组织施工作业人员学习本工程抹灰的施工工艺、施工重点、难点以及施工质量等有关的技术。1.1.1 确定各细部做法及相应流程。1.1.2 提供主要材料计划,为物资备料做准备。1.1.3 施工前进行技术交底,抹灰前先做样板墙经验收合格后方可大面积施工。1.2 材料准
24、备1.2.1 水:拌制砂浆用水采用地下降水及市政自来水并经检验合格。1.2.2 砂浆:本工程使用 M10 预拌砂浆,其质量控制必须满足预拌砂浆技术规程 (DGJ32/J13-2005)的规定。预拌砂浆进场前由项目部检查出厂合格证、出厂检验报告,并会同监理单位对预拌砂浆进行见证取样。1.2.3 掺合料:混凝土界面处理剂、胶粘剂、防冻剂、抗裂纤维等掺合料必须符合设计要求和国家产品标准规定,其掺量应该按使用说明并通过试配确定,其性能应该与墙面涂料的性能匹配。 1.2.4 工具:铁锨、筛子、灰斗车、扫把、水管、喷壶、小线、卷尺、线坠、拖线板、靠尺、水平尺、方尺、尺杆、钢筋卡子、灰槽、铁抹子、木抹子、塑
25、料抹子、阴角抹子、阳角抹子、刮杠、钢丝刷、铁锤、錾子、排笔。二、作业条件(包含施工顺序)2.1 作业条件2.1.1 弹好室内 50 线和抹灰边线。2.1.2 室内砌体及补砌斜砖均作业完成并养护到位。2.1.3 穿墙洞及预埋线管管槽已经固定牢靠2.1.4 样板间施工完成后经建设、监理单位验收合格后方可大面积施工。2.1.5 施工人员已经接受进场三级安全教育工作,学习并掌握施工技术、安全交底内容。2.2 施工顺序2.2.1 内墙抹灰工艺流程 基层处理挂加强网吊直、套方、贴灰饼、设标筋界面处理做护角弹灰层控制线抹底灰抹面灰养护 2.2.2 外墙抹灰工艺流程 基体处理挂钢丝网挂线、贴灰饼、冲筋界面处理
26、弹灰层控制线抹底灰弹分格缝位置粘分格条抹面层起条、勾缝养护 三、抹灰工程做法及要求3.1 门窗收口:根据现场实际情况,确定门窗洞口收口尺寸。门窗框安装完成后用 M10 水泥砂浆measures planned implementation of technical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should pe
27、riodically check the anti-accident measures planned, security technology protection measures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (
28、company) production staff (including internships, commissioned officer), must be approved by the factory (company), workshop and team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production tech
29、nology section recovery archive, and reported to the company trade unions, safety record. Training and examinations including the safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The
30、 39th article: new producers must receive the following training and qualified posts: (a) the operating personnel, scheduling, must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, t
31、echnical specifications for learning and class practice; (C) special operations personnel, must pass the national professional training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regul
32、arly carry out targeted of technical questions and answers, an accident expected on site training and anti-accident; (B) from running post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examinat
33、ion. The 42nd article: June of every year once regulatory and safety procedures of the company system of examinations, examination the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the
34、examination, as a formal announcement are eligible to work as ticket issuer, head of inspection, work permits and the right to a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they ca
35、n post. 44th: for breach of discipline system caused the accident, a kind of disorder and attempted serious responsibility for the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Arti
36、cle 45th: units of the company using the security video, slide projector, television, computer, multimedia, radio, Billboard, artifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted,
37、Visual training, enhancing workers safety awareness and self-protection ability. Article 46thregular issuance system of internal and external accident cases, organizational learning, analysis and discussion on a regular basis, and educate the persons concerned in a timely manner. 47th article: stren
38、gthening the safety of staff, establishing the concept of legalization of production safety, establish a “people-oriented“ concept, “three do no harm“ (dont hurt yourself, no harm to others, not to be hurt). 48th eighth day routine: pre-shift and post-shift monitor organizations, safety assist. Befo
39、re class: succession (started), combined with shift operation and tasks for better risk analysis, arranged security account considerations. After class: summarizing comment on duty and the security situation, praise good deeds criticism ignored safety, illegal operations and other adverse phenomena,
40、 and completes the record. 49th: safety day event organized by the monitor, safety help, workshop leaders and checking activities. Classes (groups) or rotating a safety day event a week, activities to learn more about the superior file and the spirit of the meeting, informed of the accident, analysi
41、s of the company, workshop and fewer security incidents, as well as the typical illegal team, analysis of operation environment, there may be a risk factor for the main content. 50th: security analysis companies every quarter of a security analysis; shop at least once a month analysis, comprehensive
42、 analysis of production trends, sum up lessons learned from and the weakness in safety management, accident prevention measures in the study. Meeting was chaired by enterprise security responsibility, concerning the participation of Heads of Department, workshop. Formation meeting and made public. 5
43、1st: security check for carbon companys periodic and non-periodic safety checks should be carried out. Periodic inspection includes fall and spring security checks, security checks should be combined with spring or autumn season characteristics and accident law . 52nd: security analysis companies sh
44、ould all be actively involved in the preparation of security advisories, bulletins, integrated security, analysis of accident law, drawing on lessons learned from. 53rd: the companys safety safety month activities each year according to the Governments requirements and deployment of the group, safet
45、y month activities focus on advocacy efforts to improve production safety and strengthen company-wide awareness of work safety, improve the safety awareness, improving the companys safety culture. 54th: units of the company in relation to the units actual, active use of “risk analysis“ method, and i
46、s actively exploring new management tools for enterprises and job site safety analysis, identify weaknesses and potential accidents and take preventive measures in a timely manner. 55th: units of the company against the possibility of seriously affecting the safety of emergency contingency plans, an
47、d actively prepared for the critical work, ensure that the critical situation occurred after relief, rescue and recovery work in an orderly manner. 56th Nineth day construction project: company or project, the implementation of construction projects legal and construction team joint management of co
48、nstruction site safety of principle. Identified under the project bear this organizing, coordinating and oversight responsibilities;塞口,然后收口。(续下页)施工质量验收技术资料通用表施工技术交底记录A.0.19工程名称 朱雀云天项目 3#楼 交底日期 2014 年 8 月 1 日交底项目 粉刷工程 工程部位 1-12 层粉刷交底提要 粉刷施工工艺及方法内容:(接上页)门窗框安装完成并验收合格后进行,采用 M10 水泥砂浆进行塞口,砂浆的水灰比不宜过大,避免砂浆干
49、缩开裂形成渗漏雨水的缝隙,因此砂浆塞口必须塞密实,施工中必须重点检查和控制。内外窗台抹灰前应先将混凝土基层清理干净,然后用水泥胶浆拉毛,最后用水泥砂浆进行收口。外窗台的收口坡度 10mm 坡向外沿,且外窗台的收口高度顶点不得高于内窗台3.2 多水房间:本工程多水房间采用涂膜防水,故卫生间等多水房间由于防水需要进行拉毛。底灰抹完第二天方可开始抹面层灰。面层灰厚度不小于 9。抹灰前先用水适当湿润底灰层,用刮杠横竖刮平,木抹搓毛,待其表面收浆、在面层收浆无明水时用软毛刷蘸水垂直于地面轻刷一遍,拉毛时用力均匀,速度一致。多水房间墙面在墙根部从 50 线向下量 20,距地面 30处表面压光,粉刷完将压光部分必须清理干净。四、操作要点及技术措施4.1 施工放线:根据楼层中的控制轴线,事先测放出每一楼层墙体线和门窗洞口的位置线(门窗洞口考虑粉刷层厚度 15mm) ,将窗台和窗顶的位置标高线标识在剪力墙上。待施工放线完成后,上报技术部门验收合格后,方可进行墙体砌筑。4.2 基层处理:清理基层,基层表面进行喷水的过程中用扫帚从上向下喷淋一遍,对扫帚清扫不掉的流浆、杂物等进行錾除。墙面清理完后,对施工损坏的棱角和零星管道洞进行修复,管道修补要求管道必须固定牢靠,在管道一周先进行