1、1 Introduction The patrol inspection of this week was carried out on 10000T quay, SPP35 18#, SPP35 19# and SPP35 20# vessels were checked as the key point. The main issues in these three vessels are the scaffold erecting could not meet the requirement and the housekeeping condition is not good, stil
2、l need a big improvement. 本周检查了万吨码头,重点检查了18#35、19#35和20#35船。主要问题是船上脚手架不能满足搭设要求并且船上5S状况不是很好,需要很大的提升。2 Follow up of Previous Findings Feedback of 86# weekly report has been received from shipyard 86期反馈周报已经收到。3 Non Conformance with procedures The following NCRs were identified and have been reported to
3、 ZJ Shipbuilding Company for closeout: :下面的异常,需要浙船确认并关闭:SPP35 18# vessel The scaffolds erected above engine room were lacking a large of platform; the scaffolding platform was just covered for half of place. It was assumed that the big hole maybe opened for the lifting job performed in engine room,
4、after the lifting work, the scaffolding platform shall be fixed completed immediately. At the same time, the worker was allowed to stand on this unqualified scaffold to carry out work (Figure 1). The same location, scaffold erected upper that scaffold needs to be improved for a big step. This scaffo
5、ld seems to be used for the pipes checking and also needs somebody standing on it, there was not guardrails installed for this scaffold and also the scaffolding platform was not covered carefully (Figure 2). 机舱上面脚手架缺少大的脚手架平台,脚手架平台只是覆盖了一半。机舱内打开的大孔看起来是为了起重作业,起重作业后,脚手架平台应该立即铺满跳板。同时,员工被允许站在这种不合格的脚手架上作业(
6、图1) 。同样的位置,支架上树立的脚手架需要很大的提升。这种脚手架看起来是用于管道检查并且需要有人站在上面,没有安装护栏并且脚手架平台没有铺设完整(图2) 。In bow thruster room, the rubber hose was connected with different color materials, it could not be sure that rubber hose was used for transferring which kind of gas (Figure 3). 艏侧推,气管使用不同颜色的材料,不能确定那种气管传输哪种气体(图3) 。SPP35 1
7、9# vessel During the patrol, it was found grinding work was performing in engine room, and the related signboards had been hung at the conspicuous locations. For the further investigation, the main access had been destroyed, through the grinding area was not allowed to get in without permission, it
8、is not mean the working place could be allowed out of control, the basic safety requirements still need to be strictly implemented, the workers who working inside still need the safety measures to protect (Figure 4). 在检查中,我们发现机舱内有打磨作业,相关的标识牌已经挂在明显的位置。通过进一步的调查,主要通道已经被摧毁,未经许可不能通过打磨区域,这并不意味着作业点失控,基本安全要
9、求仍需严格执行,员工在里面作业仍需安全防护措施(图4) 。On main deck, hatch opened without safeguard protection, and the hatches were opened not limited to one or two. About the holes protection, especially for these hatches on the main deck, it is no need to highlight again and over again, the safeguards must be installed on
10、ce the hatches opened (Figure 5). 在主甲板,舱口盖打开没有防护栏,并且不仅仅是打开一个两个。关于孔洞防护,尤其是主甲板上面的舱口,不需要反复强调,舱口盖一旦打开必须安装防护栏(图5) 。Too much garbage was left on the scaffolding platforms which were erected inside stern thruster room (Figure 6). 艉推脚手架平台上有太多的垃圾(图6) 。SPP35 20# vessel On the main deck, for the previous issue
11、 that the entry for getting in cargo room was lacking of safeguard protection, this week, the simple triangle safeguard was installed there. This kind of safeguard could not be accepted for the big holes protection, it is not safe enough to prevent people dropping down (Figure 7). 在主甲板,前期的问题是通往货舱的入口
12、处缺少护栏防护,本周,安装了简易三角防护栏。这种类型的防护栏杆对于较大的孔洞防护不能被接受,不足以安全保护员工不坠落(图 7) 。Housekeeping near the main switch room shall be kept more clear and clean. The broken movable scaffold shall be removed and lots of cables were piled on the floor, these cables need to be hung up (Figure 8). 主配室附近5S情况应该保持更清洁。已经损坏的移动式脚手
13、架应该移除,大量电缆线堆放在地面上,电缆需要架空(图8) 。One piece of plank scaffold put on the machine or flange as the working platform in engine room, this kind of scaffold was not accepted to be used on jobsite, they must be removed immediately, this issue was found last patrol about 20# vessel, it still in there without
14、fixing (Figure 9). 一块脚手板放在设备或者法兰上作为作业平台,这种脚手板不允许在作业点使用,必须立即拆除,这个问题在上次检查20#船时发现,仍然没有解决(图 9) 。Scaffolding platform above the stairs in stern thruster room should be fully covered, because some workers were working on it (Figure 10). 艉推梯道上脚手板应该满铺,一些员工在作业(图10) 。(Figure 1-Incomplete scaffold platform) (F
15、igure 2-This scaffold could not be accepted) (Figure 3-Diffierent color cables make confused) (Figure 4-Basic safety measure still need to be taken when grinding work) (Figure 5-Hatch opened without precaution) (Figure 6-Garbage left on the scaffold) (Figure 7-This kind of safeguard could not be accepted) (Figure 8-Housekeeping situation) (Figure 9-This scaffold shall be removed) (Figure 10-This scaffold platform shall be fully covered)