1、AHE:外观颜色匹配工程师APQP:产品质量先期策划DRE:设计发布工程师DTS:尺寸技术准备ETR:工程试装要求EWO:工程更改FE:功能评估GCA:全球顾客评审GD date material must be delivered in order to allow a build event to begin. 物料需求日期MSA: Measurement Systems Analysis 测量系统分析MVBns: Manufacturing Validation Build non-saleable 非销售车制造验证MVBs: Manufacturing Validation Build
2、 saleable 销售车制造验证NBH: New Business Hold 停止新业务N.O.D.: Notice of Decision 决议通知OEM: Original Equipment Manufacturer 主机客户PAD: Production Assembly Documents 生产装配文件PC&L: Production Control & Logistics 生产控制&物流PDT: Product Development Team 产品开发小组PFMEA: Process Failure Modes and Effects Analysis. It is used
3、to identify potential failure modes associated with the manufacturing and assembly process. 过程失效模式和后果分析PPAP: Production Part Approval Process 生产件批准程序Ppk: Performance index for a stable process 过程能力指数PPM: 1) Program Purchasing Manager, 2) Parts per Million (rejects and returns to suppliers) 1)项目经理 2)
4、每百万件的产品缺陷数PPV: Product & Process Validation 产品及过程验证PQC: Product Quality Characteristic 产品质量特性PR/R: Problem Reporting & Resolution 问题报告及解决PSA: Potential Supplier Assessment, a subset of the Quality System Assessment (QSA) 潜在供应商评审PV: Product Validation 产品验证QSA: Quality System Assessment 质量体系评审QSB: Qua
5、lity Systems Basics 质量体系基础QTC: Quoted Tool Capacity 工装报价能力RASIC: Responsible, Approve, Support, Inform, Consult 负责、批准、支持、通知、讨论RR: Run at Rate 按节拍生产RFQ: Request For Quotation 报价要求RPN: Risk Priority Number related to FMEA development 风险顺序数RPN Reduction Plan: An action plan that describes what is being
6、 done to reduce the risk priority number for items listed in the DFMEA or PFMEA. 降低RPN 值计划SDE: Supplier Development Engineer 供应商开发工程师SFMEA: System Failure Mode and Effects Analysis 系统失效模式分析SMT: System Management Team 系统管理小组SOA: Start of Acceleration 加速开始SORP: Start of Regular Production 正式生产SOR: Sta
7、tement of Requirements 要求声明SPC: Statistical Process Control 统计过程控制SPO: (General Motors) Service and Parts Operations (通用汽车)零件与服务分部SQ: Supplier Quality 供应商质量SQE: Supplier Quality Engineer 供应商质量工程师SQIP: Supplier Quality Improvement Process 供应商质量改进过程SSF: Start of System Fill 系统填充开始SSTS: Sub-system Tech
8、nical Specifications 子系统技术规范Sub-Assembly / Sub-System: An assembly of sub-components delivered to the SGM main production line for installation to the vehicle as a single unit. Subcontractor: The supplier of a sub-component to a Complex System/Subassembly supplier (Tier 2, 3, etc). 分供方SVE: Sub-Syste
9、m Validation Engineer 子系统验证工程师SVER: Structure Vehicle Engineering Release. 结构车工程发布Team Feasibility Commitment: An AIAG APQP form that is provided with the Request for Quotation. It is the suppliers concerns with the feasibility of manufacturing the part as specified. 小组可行性承诺TKO: Tooling Kick-Off 模具启动会议UG: Unigraphics UG工程绘图造型系统VLE: Vehicle Line Executive 车辆平台负责人VTC: Validation Testing Complete 验证试验完成WO: Engineering Work Order 工程工作指令