1、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparat
2、ion of the medium-and long-term planning and control water (a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the abi
3、lity to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no high
4、er than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in
5、mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with i
6、t. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c
7、mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizont
8、al distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall
9、 within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole surve
10、y water should use a dedicated .Exam exam elements 1. find out the Central thesis of the article 2: identify types of arguments summarized the arguments of the main content 3. identification of the methods used in this paragraph or sentence, and its benefits. 4. (this paragraph) demonstration (proce
11、ss) what is it? 5. taste the benefits or effects of some words in a sentence. 6. for an article to add a fact or reasonable argument 7. do you agree with the author? Please explain the reasons. Argumentative is talking about as the main expression of style. Through facts and reason, use logic to sho
12、w that the authors views and attitudes to an issue and analysis on some phenomenon of insights and ideas. Three elements of argumentation elements: argument 1, argument: argument: authors opinions, views and ideas. (Right, distinct) Note: essays generally have only one argument, some around the cent
13、ral argument put forward several arguments, arguments are used to justify central argument. Find argument of method: a to see articles of title II to note argument in articles in the of location title reveals; b beginning proposed; c talk process in the sharp proposed; d end antibody; articles in th
14、e no proposed, needed readers himself antibody note distinguish topics and argument: topics is talk paper by to described of main content, and argument is author on by described of content by made of clear of judge of sentences. 2, looking for or refine the method arguments: (a), see topic (b), star
15、t (c), end (four), middle (five), his induction an honest man is always suffer? in the dark old days of corruption, honest people suffer is not surprising, even commonplace. However, with the development and progress of society, honest man suffer losses no longer become a common and normal phenomeno
16、n. Dishonest people may be proud of a moment, but ultimately the expense of them. As Lu Xun said leasing will also drown his own. Illusion and lies was uncovered the day liar He Yan people? some flattery, speculative hack who soon would be appreciated by a boss, but he would always ride it? the sayi
17、ng goes: “clever to be wise“ dishonest people ultimately have to pay the price for his dishonesty. Overall, or doing an honest man does not suffer. This argument is an honest man does not lose exam: argument is that how come? Introduction of arguments: (1), straight to the central argument put forwa
18、rd. For example: on the backbone of the proposed opening of “we Chinese are proud of“ (2), ask questions, add a central argument. For example: of the thinking and doing for “dreams“ and “death“ of the arguments. (3) cases, according to the experience of a life point (4), draws from the story problem
19、s, arguments (5), the central argument put forward in some way. For instance, metaphor, comparing elements of the second: the arguments argument: the material to prove point. (Authentic) 1, argument type facts .2007 年 度 科 技 型 中 小 企 业 技 术 创 新 基 金 若 干 重点 项 目 指 南科 学 技 术 部 编 制通 知 ( )技术领域及若干重点项目( )一 、 电
20、子 信 息 ( )二 、 生 物 、 医 药 ( )三 、 新 材 料 ( )四 、 光 机 电 一 体 化 ( )五 、 资 源 与 环 境 ( )六 、 新 能 源 与 高 效 节 能 ( )七 、 高 技 术 服 务 业 ( )详 细 目 录一 、 电 子 信 息( 一 ) 软 件 产 品 ( )1 系 统 软 件 ( )2 支 撑 软 件 ( )3 中 间 件 软 件 ( )4 嵌 入 式 软 件 ( )1, coal mines, mine are in charge of the water control work responsibility, and (b) specific
21、ally responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparation of the medium-and long-term planning and control water (a) plans, and their implementati
22、on. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the ability to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of min
23、e main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no higher than c, higher than d, less than 5, mine main pumping station should be at least (b) exit
24、s, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total
25、capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with it. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the
26、 ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c mining, after the first had the suspects will find d, excavations will be 10, penetrating ex
27、ploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizontal distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5
28、M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roa
29、dway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole survey water should use a dedicated .Exam exam elements 1. find out the Central thesis of the art
30、icle 2: identify types of arguments summarized the arguments of the main content 3. identification of the methods used in this paragraph or sentence, and its benefits. 4. (this paragraph) demonstration (process) what is it? 5. taste the benefits or effects of some words in a sentence. 6. for an arti
31、cle to add a fact or reasonable argument 7. do you agree with the author? Please explain the reasons. Argumentative is talking about as the main expression of style. Through facts and reason, use logic to show that the authors views and attitudes to an issue and analysis on some phenomenon of insigh
32、ts and ideas. Three elements of argumentation elements: argument 1, argument: argument: authors opinions, views and ideas. (Right, distinct) Note: essays generally have only one argument, some around the central argument put forward several arguments, arguments are used to justify central argument.
33、Find argument of method: a to see articles of title II to note argument in articles in the of location title reveals; b beginning proposed; c talk process in the sharp proposed; d end antibody; articles in the no proposed, needed readers himself antibody note distinguish topics and argument: topics
34、is talk paper by to described of main content, and argument is author on by described of content by made of clear of judge of sentences. 2, looking for or refine the method arguments: (a), see topic (b), start (c), end (four), middle (five), his induction an honest man is always suffer? in the dark
35、old days of corruption, honest people suffer is not surprising, even commonplace. However, with the development and progress of society, honest man suffer losses no longer become a common and normal phenomenon. Dishonest people may be proud of a moment, but ultimately the expense of them. As Lu Xun
36、said leasing will also drown his own. Illusion and lies was uncovered the day liar He Yan people? some flattery, speculative hack who soon would be appreciated by a boss, but he would always ride it? the saying goes: “clever to be wise“ dishonest people ultimately have to pay the price for his disho
37、nesty. Overall, or doing an honest man does not suffer. This argument is an honest man does not lose exam: argument is that how come? Introduction of arguments: (1), straight to the central argument put forward. For example: on the backbone of the proposed opening of “we Chinese are proud of“ (2), a
38、sk questions, add a central argument. For example: of the thinking and doing for “dreams“ and “death“ of the arguments. (3) cases, according to the experience of a life point (4), draws from the story problems, arguments (5), the central argument put forward in some way. For instance, metaphor, comp
39、aring elements of the second: the arguments argument: the material to prove point. (Authentic) 1, argument type facts .5 计 算 机 辅 助 工 程 /产 品 开 发 软 件 ( )6 中 文 及 多 语 种 应 用 软 件 ( )7 图 形 图 象 应 用 软 件 ( )8 金 融 信 息 化 软 件 ( )9 地 理 信 息 系 统 ( )10 电 子 商 务 软 件 ( )11 电 子 政 务 软 件 ( )12 企 业 管 理 软 件 ( )( 二 ) 微 电 子 技
40、 术 ( )1 集 成 电 路 设 计 工 具 开 发 ( )2 集 成 电 路 产 品 设 计 开 发 ( )3 集 成 电 路 封 装 技 术 ( )4 集 成 电 路 测 试 ( )5 集 成 光 电 子 器 件 ( )( 三 ) 计 算 机 及 网 络 产 品 ( )1 计 算 机 和 终 端 产 品 ( )2 各 类 计 算 机 外 围 设 备 及 关 键 部 件 ( )3 网 络 产 品 ( )4 空 间 信 息 获 取 及 综 合 应 用 集 成 系 统 ( )1, coal mines, mine are in charge of the water control work
41、responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparation of the medium-and long-term planning and control water (
42、a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the ability to resist water damage. A, b, c, grass-roots leaders, l
43、eaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no higher than c, higher than d, less than 5, mine main pumping sta
44、tion should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity
45、should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with it. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeol
46、ogical conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c mining, after the first had the suspects will find d, excava
47、tions will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizontal distance (d) as the standard, thick coal seam in the bore
48、 hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up t
49、he Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole survey water should use a dedicated .Exam exam elements 1. find out the Central thesis of the article 2: identify types of arguments summarized the arguments of the main content 3. identification of the methods used in this paragraph or sentence, and its benefits. 4. (this paragraph) de