1、FORM 26-1M SPECIFICATION SHEET FOR ASME SECTION VIII,DIVISION 1APPENDIX 26 BELLOWS EXPANSION JOINTSDate:1.2.3.4.Item Number:Drawing/Tag/Serial/Job Number:Quantity:Size:5.6.7.Internal Pressure:External Pressure:Vessel Manufacturer Hydrotest Pressure:U-2 Partial Data Report required per Appendix 26 pa
2、ra.2613.Temporary shipping bars are required to maintainassembly length during shipment and vessel fabrication only,and ARE NOT to be used during vessel hydrotestfor expansion joint pressure restraint see para.264.1(c)and(d).Internal:MPaDesign:Design:MPaMPaO.D.Applicable ASME Code Edition:Vessel Man
3、ufacturer:Vessel Owner:Installation Location:Expansion Joint Overall Length:I.D.mm mm8.9.Temperature:Vessel Rating:Design:MAWP:Operating:MDMT:Installed Position:Horiz.Vert.10.11.12.13.14.15.16.Shell Material:Shell Thickness:Shell Radiography:End Preparation:Heat Exchanger Tube Length Between Inner T
4、ubesheet Faces:mm Shell Corrosion Allowance:Internal:mmNoneSquare Cut Outside Bevel Inside Bevel Double Bevel(Describe in Line 23 if special)Spot Full/17.18.19.20.21.22.23.Maximum Bellows Spring Rate:Internal Liner:Drain Holes in Liner:Liner Flush With Shell I.D.:External Cover:Pre-production Approvals Required:Additional Requirements(i.e.,bellows preset,ultrasonic inspection.):NNNNNNN YY-Y-Material:Y-Quantity/SizeY-Telescoping Liners?Y-Material:Y-Drawings/Bellows Calculations/Weld ProceduresN/mmmmcyclesmm Lateral:mm Angular:degUpset:External:MPaBellows Material:External:mm: