收藏 分享(赏)

ASME标准全套数据报告表格N-7.pdf

上传人:wrn 文档编号:15746793 上传时间:2023-01-17 格式:PDF 页数:2 大小:134.10KB
下载 相关 举报
ASME标准全套数据报告表格N-7.pdf_第1页
第1页 / 共2页
ASME标准全套数据报告表格N-7.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、FORM N-7 NUCLEAR CONTAINMENTSAs Required by the Provisions of the ASME Code,Section III,Division 31.Manufactured and certified by2.Manufactured for3.Transport and/or Storage(name and address)4.Type(horiz.or vert.)(Containment serial no.)(Cert.Holders serial no.)(CRN)(Natl.Bd.no.)(year built)5.ASME C

2、ode,Section III,Division 3:(edition)(addenda date)(class)(Code Case no.)6.Shell:(matl spec.no.)(tensile strength)nom.thickness(in.)dia.ID(ft&in.)length(overall)(ft&in.)7.SeamsL ong:;girth(type)(HT)(RT or UT)(joint eff.%)(type)(HT)(RTo rU T)(joint eff.%)8.Heads:(a)matl.spec.no.(tensile strength)(b)ma

3、tl.spec.no.(tensile strength)(c)matl.spec.no.(tensile strength)(d)matl.spec.no.(tensile strength)Location(top,Crown Knuckle Elliptical Conical Hemispherical Flat Side to Pressurebottom,ends)T hickness Radius Radius Ratio ApexA ngle Radius Diameter(convex or concave)(a)(b)(c)(d)If removable,bolts use

4、d;.I fq uick opening closure or other fastening described in detail:9.Design pressure at.M in.pressure-test temp.Pneu.,hydro.,or comb.test pressure(psi)(F)(F)(psi)He1 leak testmax.acc.leak rate(from fab.spec.)10.Supports:Lugs Legs Other Attached(yes or no)(quantity)(quantity)(describe)(where and how

5、)11.NozzlesPurpose How Reinforcement(inlet,outlet,drain,etc.)Quantity Dia.or Size Type Attached Matl Thickness Material Location12.Parts and appurtenances and piping subassemblies supplied by others(Data Reports attached).(a)Part,Appurtenance or(b)Serial No.(c)CRN No.(d)Natl.Bd.No.Piping Subassembly

6、13.For containments list identifying markings of matching itemst ob e joined in the field by welding.to be welded to(closure plates,heads)(shell assembly)14.Remarks:(7/02)FORM N-7(Back Pg.2of)Certificate Holders Serial No.CERTIFICATIONO FD ESIGNDesignS pecification on file at P.E.State or Prov.Reg.N

7、o.DesignS pecification certified by P.E.State or Prov.Reg.No.DesignR eport on file at P.E.State or Prov.Reg.No.DesignR eport certified by P.E.State or Prov.Reg.No.FabricationS pecificationo n file at P.E.State or Prov.Reg.No.FabricationS pecification certified by P.E.State or Prov.Reg.No.CERTIFICATE

8、O F COMPLIANCEF OR OVERALL RESPONSIBILITYFollowing completiono f the above,the Certificate of Authorization Holder accepting overall responsibility for this Division 3 containments hallcomplete the following statement:We certify that the statements made by this report are correct and that constructi

9、on of the items described in this Data Report conformst o therules of the construction of the ASME Code,Section III,Division 3.N3 Certificate of AuthorizationN o.ExpiresDate N3 Certificate Holder Signed(authorized representative)CERTIFICATEO FI NSPECTIONI,theu ndersigned,holding a valid commission i

10、ssued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Provinceof and employed byof have compared the statements described on this Data Report with those described in the attached Certificate Hold-ers Data Reports and to the best of my knowledge and belief,the describe

11、d itemsh ave been constructed in accordance with the ASME Code,Section III,Division 3.By signing this certificate,neither the inspector nor his employer makes any warranty,expressed or implied,concerning the itemsd escribed inthis Data Report.Furthermore,neither the inspector nor his employer shall

12、be liable in any manner for any personal injury or property damageor a loss of any kind arising from or connected with this inspection.Date Signed Commissions(Authorized Nuclear Inspector)Natl.Bd.(incl.endorsements)and state or prov.and no.CERTIFICATEO F SHOP COMPLIANCEWe certify that the statements

13、 made in this report are correct and that this nuclear containment conformst o the rules for construction of theASME Code,Section III,Division 3.N3 Certificate of AuthorizationN o.ExpiresDate Name Signed(N3 Certificate Holder)(authorized representative)CERTIFICATEO F SHOP INSPECTIONI,theu ndersigned

14、,holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Provinceof and employed byof have inspected the component described in this Data Report on,and state that to the best of my knowledge and belief,the Certificate Holder has constructed t

15、his component in accordancewith the ASME Code,S ection III,Division 3.By signing this certificate neither the inspector nor his employer makes anyw arranty,expressed or implied,concerning the component describedin this Data Report.Furthermore,neither the inspector nor his employer shall be liable in any manner for any personal injury or property damageor a loss of any kind arising from or connected with this inspection.Date Signed Commissions(Authorized Nuclear Inspector)Natl.Bd.(incl.endorsements)and state or prov.and no.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 规范标准 > 国内外标准规范

本站链接:文库   一言   我酷   合作


客服QQ:2549714901微博号:道客多多官方知乎号:道客多多

经营许可证编号: 粤ICP备2021046453号世界地图

道客多多©版权所有2020-2025营业执照举报