1、电气英文自我评价范文本文是关于电气英文自我评价范文,仅供参考,希望对您有所帮助,感谢阅读。电气英文自我评价范文篇一My name is *, engaged in electrical equipment repair work has been5 years. Since * * * years to * * company, has been working formore thantwoyears.From entering thecompany hasbeenengagedinsubstation operation and maintenance and management. Ha
2、s participated inand organizeda high-pressuremeasurement and relayprotectionsettingandcalibration; reactive power compensation and voltage setting; DC screeninspectionandmaintenance;substationsecondarycircuitfaultandprocessing;high-voltagecabinetfailureand treatment;high-voltage cablehead production
3、 and processing; substation in the spring and autumn alloverhaul and maintenance; outdoorhigh voltageoverhead linefaulthandlingand maintenance. I always assiduously with high-voltage technology toimprove the operating rate of the combination, and actively study theprinciplesofhigh-voltageequipmentan
4、dmaintenanceexperience,andinsist on constantly improve their theoretical and practical skills tosolve the substationrunninga lotTechnicalproblems,inordertoimprovethe power transmissionand transmission equipmentoperating rate and laida good foundation.Substationisthe power system inthe power of thevo
5、ltageand current transformation, concentration and distribution of the place.In order to ensure the quality of electrical energy and the safety of theequipment,voltageregulation,powerflowandvoltagedistribution,distribution of power, current and power in each node and branch of thepower systemandcont
6、roloftransmissionanddistributionlinesandprotectionofmajorelectricalequipment. Nowsubstationover thepasttwoyears have experienced the work summarized as follows:1, vacuum circuit breakers in the daily operation of the fault typesand treatment.November 8, 20xx due to power company line fault on my com
7、pany largepower outage for 3 hours. After receiving the notice, we press the powersubstation regular power outage procedures for power outages. When thepower company to deal with failure after transmission, according to powertransmission step. Then found the 35KV main transformer vacuum circuitbreak
8、er refused to close, this is my company has just put into operationfortwomonthsthe firsttime thesubstation problems,ourcompanysubstation 35KV high voltage cabinet vacuum circuit breaker is appliedChint ZN85-40.5 circuit breakers. In the experimental state found afterclosingthe circuitbreakercommand,
9、closingelectromagnetaction,the coreplunger will close the pawl top open, closing the spring release energy,driving the circuit breaker closing, but the circuit breaker interruptercan not be together brake. After analysis, indicating that mechanicalfailurehas been excluded,indicatingthatthe secondary
10、linefault,foundinthe secondaryauxiliaryplug has a needle and controlwiredesoldering,vacuum breaker to deal with after closing, fault problem solving. Vacuumcircuitbreakersin the daily work ofthe most prone to failureto be summedup: 1. positive air circuit breaker refused to sub (gate)2. Vacuum circu
11、it breaker body energy storage, energy storage motor stop 3. Vacuum interrupter interrupter can not be disconnected 2, the current transformer secondary open and deal with* * The end of the month, the power company came in February of theelectricity details, with my company substation measured by th
12、e amount ofdifference 20xx2KW.h. I led the technical staff to conduct a comprehensive inspection of high-pressure measurement, due to limited conditions, failedto findfault problems.The company invitedthepower company meteringandtestingcentersubstationsecondary circuittest.The currenttransformer,vol
13、tage transformer, secondary voltage drop and secondary load, electricenergy meter of35KV and 10KV each switchcabinet are tested.In the powercompany equipmenttestingfound35KV highback-upprotectionoftheterminalhasanindirectopenphenomenon.Afterprocessing,inthespecifiedtimewith thepower company metering
14、center,theproblem has beenresolved.CurrenttransformerCT primarywindingnumber ofturnsissmall,the useof a winding in seriesinthe measured line,the secondary windingturns,and measuring instrumentsand relaysand othercurrentcoilinseries,measuring instruments and relays and other current coil impedance is
15、 verysmall , So the normal operation of CT is close to short-circuit state. CTsecondary currentsizedeterminedby theprimarycurrent,secondarycurrentgenerated by the magnetic potential, is to balance the current magneticpotential. If the secondary open circuit, the impedance is infinite, thesecondary c
16、urrentis equal tozero,the magnetic potentialisequal to zero,can not balance the current generated by a magnetic potential, then acurrent will act on the excitation, the core serious saturation. Magneticsaturation increases the iron loss, CT fever, CT coil insulation will beburned by overheating.But
17、alsointhe core to produce remanence, increasingthe transformererror.The most seriousisdue to themagnetic saturation,alternating sine wave into a trapezoidal wave, the rapid changes in fluxmoment, the secondary coilwillinduce a high voltage,the peak up toseveralthousand volts, so high Of thevoltage o
18、n the secondary coil and thesecondary circuit, the person and equipment are a serious threat.3, to complete the good leadership of the other basic and temporary work assigned.Over the past year, I am learning and working in the gradual growthand maturity,but I know there are manydeficiencies,such as
19、 lack of abilityto workand innovation,lack of politicaltheoryto be improvedand so on.In the future I will try to do the following, I hope the leadership andcomrades of my supervision and guidance:1, consciously strengthen the study, to the theory of learning, toprofessionalknowledgelearning,learning
20、tocolleaguesaround,andgradually improve their theoretical level and operational capacity.2, to overcome the young gas impatient,so down to earth,improve workinitiative, not afraid to do more things, not afraid to do small things,improve the practice in the bit to improve themselves.3, continueto imp
21、rove theirpoliticalaccomplishment,strengthenthesense of purpose of servingthe people,and striveto becomean outstandingnational civil servants.电气英文自我评价范文篇二This year is coming to an end, in order to be able to work better in the next year, sum up experience, adhere to the advantages and correct defici
22、encies, according to company requirements, summarized as follows: in a years work, through the summary, although made some progress, A lotof shortcomingsand deficiencies.As an electricaland mechanical workshopelectrical technicians, in the production of work is only constantly sumup the lessons lear
23、ned and found that in order to make their own fasterprogress.First, in-depth, solid workAs an electrical technician in the electromechanical workshop of thecoal preparation plant, my main responsibility is to be responsible forthe managementof electricaltechnologyin the electromechanicalworkshop,to
24、work out the maintenance arrangement of the electrical equipment andthecorrespondingmanagement rulesand technicaloperationmeasures,organizethe stafftodo well in thebusinesstraining;Oftenin-depthsite,continue to promote new technology and new technologies.Over the past year, I have been working hard,
25、 fulfilling my dutiesseriously, constantly improving myself from the technical and managementlevel, and have made great achievements in all aspects. I work in theworkshop withthesame below the master of the workers,equipment problemsencountered actively to the scene to deal with failures, eliminate
26、hiddendangers.Insist on the scene everyday tocheck the operationofequipment,high and low voltage equipment for power supply and distribution; masterproductionprocessofcoalpreparationtolearntheprincipleofcentralizedcontrol;understandthecontrolsignalroutinglayout,information transmission. Now many asp
27、ects have made great progress, forexample: the communication 2 station system, the elevator runningsystem,automaticcontrolsystem concentrator,filterclosed-loopcontrolsystem, King configuration system, pressurized filter system, the mainplant and new plant coal washing system, from shallow to deep gr
28、asp thebasic control structure and principle of the system. So I have a verythoroughunderstandingoftheproductionprocess ofcoalwashing,and havelearned the knowledge and the actual production of effective combinationfor thefuturetobettertheorywithpractice,betterpromote theproduction,betterreduce thewo
29、rkersThe master of thelabor intensity,more effectiveto improvelaborproductivity,forenterprisesand thecommunity to createmore benefitslaidasolidfoundation.Otheraspectsofmeticulousimprovement and completion of electrical safety regulations and measuresto seriously monitor the implementation of the ann
30、ual maintenance in theXX 11, through the replacement and overhaul of the transformer, but alsolearnedalotof thingsusuallydo notsee,soIcoalwashingplantelectrical equipment with a deeper understanding.Material plan to provide timely, comprehensive, accurate spare partsparameters is the guarantee of no
31、rmal operation of the equipment, I amresponsible for the electrical equipment materials plan to report work,at work, I ran the scene, check the problem, so that spare parts can bemore comprehensive and reliable,To avoid thelackofspare partsand delaythe status of production. And through the low-volta
32、ge power distributionroom to find the problem, and other technical staff together proposed thetransformationoflow-voltagedistributionroomequipmentplan,andthroughtheproductionofselection,use,thebasicsolutiontotheproduction of spare parts for the purchase of passive, and Resulting inequipment failurep
33、roblems.Low voltagepower distributionroom ofthenewplant are used in the domestic production of electrical components, ACcontactor with the use of materials often aging, poor access to auxiliaryearly, the signalisnot normal and so on,afterthe decisiontouse importedSiemens contactor to transform it, S
34、o far, basically solved the problemcaused by the contactor accident occurred, reducing the accident rate, asubstantial increase in the driving rate, to ensure the normal productionof coal washing.In the work, the first is strict on their own, do not allow the staffto do, their firm quit, for the fie
35、ld workers to set an example. In theimplementation of the implementation of procedural measures, the stricton-site,thework ofa number of measures do not quit.The illegalbehaviorof workers and non-standard behavior resolutely stop. In the productionof security incidents and accidents affecting the pr
36、oduction of seriousorganizationalanalysis,do notgo through the motions,accountabilitydoesnottaketheform, so thattheimplementation of responsibility,education,alert everyones purpose. The second is to consider the work of small, sothattheoverallbalance,thatis,therearesafetyeducationand specificwork a
37、rrangements, taking into account the production and taking intoaccount the electrical and mechanical and business, so that the face ofall non-leakage control,thework done a layout,There are checks.Third,pragmatic,through thedailystudy,andconstantlyimprovetheirtheoretical level, operational level, pr
38、actical experience and personalqualities. Fourth, a solid work, the work does not remain on the surface,notafraidof difficulties,notafraidofwounding, truth-seekingresults,and further improve their management level.Second, join the technical innovation, never in innovationIn the work, seriously to th
39、e old comrades to learn, and constantlyimprove themselves, and use other time, learn more new knowledge. Andactivelyparticipateintheplantplcprogramcontrolsystemtothetransformation, and achieved certain results, including the following:First,seriouslyinvolvedinthe flotationautomation system, and basi
40、callymastered the flotation automatic control system, mastered the The newcontrolsystem,learnedto solve and dealwithproblemsin ways and methods;followed by the thickener automatic control system transformation, theOMRON plc with updated understanding; Third, the design of the plant ashmeasurement sy
41、stem configurationscreen Designed to makebetteruse ofgrayinstrument in the production, to make the configuration screen, you canuse the unit time of the various instantaneous ash, the unit time tocalculate the average ash to solve the ash analyzer average ash value Thedesignand transformationof the
42、chain of 302 chain-linkprotectionprocedures, and in the configuration screen to add 302 chain-link chainprotectionalarm,reducing the chainonce theparking chain willbe mistakenfora broken chainprotectorMotionproblems,and solvethepreviouschainprotectiondeviceaction,the alarmcan alsostartthecarissue, reducingtheelectriciantodeterminethe faultand solve the problem ofprocessingtime; Fifth, add the belt belt ash tester fault alarm device, the use ofAshmeasured ashcontent oftheactualvalue,comparedwith