收藏 分享(赏)

hot mix a sphalt plants compliance audit - environmental audits.doc

上传人:天天快乐 文档编号:1143700 上传时间:2018-06-15 格式:DOC 页数:4 大小:97.50KB
下载 相关 举报
hot mix a sphalt plants compliance audit - environmental audits.doc_第1页
第1页 / 共4页
hot mix a sphalt plants compliance audit - environmental audits.doc_第2页
第2页 / 共4页
hot mix a sphalt plants compliance audit - environmental audits.doc_第3页
第3页 / 共4页
hot mix a sphalt plants compliance audit - environmental audits.doc_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、ea-s5-111/10/07 Page 1 of 4Hot Mix Asphalt Plants Compliance AuditBaghouse Control Environmental AuditsMinnesota Pollution Control Agency (MPCA) compliance audit checklists are designed to assist businesses and MPCA staff with the interpretation of Minnesotas environmental laws and rules. Because th

2、e laws and rules are numerous and often complicated, this checklist cannot be a complete guide to all your compliance obligations. If you have questions about the checklist, your obligations, or its conditions that you discover as you complete this evaluation, please contact:Small Business Environme

3、ntal Assistance Program (SBEAP)651-282-6143 or 1-800-657-3938http:/www.pca.state.mn.us/programs/sbap-sectors.htmlDate of Audit: Company Name: Authorized Representative Name: Title: Baghouse Control SystemOperation of hot mix asphalt (HMA) plant control equipmentThe owner or operator of a HMA plant m

4、ust operate the baghouse control equipment in the range established by the control equipment manufacturers specifications, or within the operating parameters established by the MPCA as the result of the most recent performance test conducted under parts 7017.2001 to 7017.2060, if those are more rest

5、rictive. The HMA plant must operate the baghouse in compliance whenever operating the asphalt plant.1. Do you operate your baghouse control equipment in accordance with the manufacturers specification or your most recent performance test?YES We do operate our baghouse control equipment in accordance

6、 with the manufacturers specification or our most recent performance test.NO We do not operate our baghouse control equipment in accordance with the manufacturers specification or the most recent performance test. This is a deviation and must be reported on the DRF-2 form.Baghouse control equipment

7、alternative rangeThe owner or operator applying for a registration permit or capped permit may request an alternative range to the baghouse control equipment manufacturers specifications, if the proposed range is based on two previous years of compliance monitoring data supplied with the request. Fo

8、r HMA plants applying for a registration permit in operation on April 22, 1996, this request shall be made by the application deadline listed in part 7007.0350, subpart 1, item A. The proposed operating range shall be deemed acceptable unless notified otherwise in writing within 30 days of receipt b

9、y the MPCA. 2. Do you operate your HMA plant baghouse control equipment in an alternative range to the control equipment manufacturers specifications?YES We do operate our HMA plant baghouse control equipment in an alternative range to the control equipment manufacturers specifications based on two

10、previous years of compliance monitoring data. NO We do not operate our HMA plant baghouse in an alternative range to the control equipment manufacturers specifications based on two previous years of compliance monitoring data.A. An owner or operator has failed to disclose fully all facts relevant to

11、 the proposed monitoring parameter range of the asphalt plant baghouse control device or the owner or operator has knowingly submitted false or misleading information to the MPCA.ea-s5-111/10/07 Page 2 of 43. Have you disclosed all facts relevant to the proposed monitoring parameter range of your pl

12、ant baghouse control device? YES We have disclosed all facts relevant to the proposed monitoring parameter range of our plant baghouse control device.NO We have not disclosed all facts relevant to the proposed monitoring parameter range of our plant baghouse control device, or we have knowingly subm

13、itted false or misleading information to the MPCA. This is a deviation and must be reported on the DRF-2 form.A. Operation of the baghouse control device in the monitoring parameter range proposed by the owner or operator would endanger human health or the environment, or subject the HMA plant to di

14、fferent applicable requirements or requirements under chapter 7007.4. Do you inspect you asphalt plant baghouse control equipment in accordance with part 70, state, or general permit annually? YES We are currently operating the HMA plant baghouse control device in the monitoring parameter range prop

15、osed by the owner or operator and we are not endangering human health or the environment. NO We are not currently operating the baghouse control device in the monitoring parameter range proposed by the owner or operator and could be endangering human health or the environment. This is a deviation an

16、d must be reported on the DRF-2 form.Maintenance of asphalt plant baghouse control equipment The owner or operator of a HMA plant shall maintain each piece of asphalt plant baghouse control equipment as designed to ensure compliance with applicable requirements, comply with source-specific maintenan

17、ce requirements specified in a part 70, state, or general permit.YES We do continue to maintain each piece of our HMA plant baghouse control equipment as designed to ensure compliance with applicable requirements and do comply with source-specific maintenance requirements specified in a part 70, sta

18、te, or the general permit. NO We do not continue to maintain each piece of our HMA plant control equipment as designed to ensure compliance with applicable requirements and do not comply with source-specific maintenance requirements specified in a part 70, state, or the general permit. This is a dev

19、iation and must be reported on the DRF-2 form.The HMA Plant must perform the following on each piece of asphalt plant control equipment unless otherwise specified in a part 70, state, or general permit: A. Thoroughly inspect all asphalt plant baghouse control equipment, including structural componen

20、ts, annually. YES We do inspect our asphalt plant baghouse control equipment in accordance with part 70, state, or general permit annually.NO We do not inspect our asphalt plant baghouse control equipment annually. This is a deviation and must be reported on the DRF-2 form.B. Inspect baghouse ducts,

21、 connections, and housings for leaks monthly.5. Do you inspect your baghouse ducts, connections, and housings for leaks monthly?YES We do inspect our asphalt plant baghouse control equipment inspect ducts, connections, and housings for leaks monthly. NO We do not inspect our asphalt plant baghouse c

22、ontrol equipment ducts, connections, and housings for leaks monthly. This is a deviation and must be reported on the DRF-2 form.Check baghouse monitoring equipment Check monitoring equipment daily to ensure it is operating in the range required by, for example: pressure gauges, temperature indicator

23、s, flow gauges, and recorders.6. Do you check your asphalt plant baghouse control system monitoring equipment daily to ensure it is operating in the range required?YES We do check our asphalt plant baghouse control system monitoring equipment daily to ensure it is operating in the range required.NO

24、We do not check our asphalt plant baghouse control system monitoring equipment daily to ensure it is operating in the range required. This is a deviation and must be reported on the DRF-2 form. ea-s5-111/10/07 Page 3 of 4Calibrate monitoring equipmentCalibrate all monitoring equipment annually;YES W

25、e do calibrate all monitoring equipment annually.NO We do not calibrate all monitoring equipment annually. This is a deviation and must be reported on the DRF-2 form. Cleaning equipmentFor all fabric baghouse control devices you must check exterior cleaning system equipment and its operation daily;

26、and check interior cleaning equipment and its operation, and the clean air side of bags for evidence of leaks at least monthly.7. Do you check the exterior cleaning system equipment and its operation daily; and check interior cleaning equipment and its operation, and the clean air side of bags for e

27、vidence of leaks at least monthly?YES We do check exterior cleaning system equipment and its operation daily; and check interior cleaning equipment and its operation, and the clean air side of bags for evidence of leaks at least monthly.NO We do not check exterior cleaning system equipment and its o

28、peration daily; and check interior cleaning equipment and its operation, and the clean air side of bags for evidence of leaks at least monthly. This is a deviation and must be reported on the DRF-2 form.Maintain RecordsThe owner or operator shall maintain a record of baghouse activities conducted ab

29、ove, as well as the date the activity was completed, and any corrective action taken; and the owner or operator shall maintain the records required for a minimum of five years from the date the record was made. 8. Do you maintain a record of baghouse activities for a minimum of five years from the d

30、ate the record was made?YES We do maintain a record of activities for a minimum of five years from the date the record was made. NO We do not maintain a record of activities for a minimum of five years from the date the record was made. This is a deviation and must be reported on the DRF-2 form.Inst

31、allation of Hour Accumulating Meter Monitoring EquipmentThe owner or operator of a HMA plant shall install monitoring equipment (Hour Accumulating Meter) to measure operating hours as specified in part 7011.0922, subpart 3, and the monitoring parameters for all asphalt plant control equipment. For H

32、MA plants not in operation on April 22, 1996, the monitoring equipment must be installed prior to operation of any HMA plant equipment controlled by the control equipment. For HMA plants in operation on April 22, 1996, the owner or operator must install monitoring equipment no later than 30 days aft

33、er April 22, 1996. 9. Were you in operation on April 22, 1996, and have you installed an Hour Accumulating Meter to monitor and measure all plant operating hours?YES We were in operation on April 22, 1996, and have installed an Hour Accumulating Meter to monitor and measure all plant operating hours

34、.NO We were in operation on April 22, 1996, but have not installed an Hour Accumulating Meter to monitor and measure all plant operating hours. This is a deviation and must be reported on the DRF-2 form.Operation of Monitoring EquipmentThe owner or operator of a HMA plant must operate in compliance

35、with this part the monitoring equipment for each piece of asphalt plant control equipment at all times the asphalt plant control equipment is required to operate.10. Do you operate in compliance the monitoring equipment for each piece of asphalt plant control equipment at all times the asphalt plant

36、 control equipment is required to operate?YES We do operate in compliance the monitoring equipment for each piece of asphalt plant control equipment at all times the asphalt plant control equipment is required to operate. NO We do not operate in compliance the monitoring equipment for each piece of

37、asphalt plant control equipment at all times the asphalt plant control equipment is required to operate. This is a deviation and must be reported on the DRF-2 form.ea-s5-111/10/07 Page 4 of 4Shutdown and breakdown proceduresIn the event of a shutdown or breakdown of asphalt plant baghouse control eq

38、uipment, the owner or operator of a HMA plant shall comply with part 7019.1000. 11. Do you report all shutdowns or breakdowns of asphalt plant baghouse control equipment in accordance with part 7019.1000?YES We do report all shutdowns or breakdowns of asphalt plant baghouse control equipment in acco

39、rdance with part 7019.1000.NO We do not report all shutdowns or breakdowns of asphalt plant control equipment in accordance with part 7019.1000. This is a deviation and must be reported on the DRF-2 form.Deviation of an asphalt plant baghouse control equipment from operating specifications Unless ot

40、herwise specified in a part 70, state, or general permit, the owner or operator of a stationary source shall report to the commissioner any recorded reading outside of the specification or range of specifications from any monitored operating parameter required, except that owners and operators with

41、a registration permit option D or capped permit shall make this report only if a deviation occurred in the reporting period. This is reported on the DRF-2 form.12. Do you report to the commissioner all recorded readings outside of the specification or range of specifications from any monitored opera

42、ting parameter?YES We report to the commissioner all recorded readings outside of the specification or range of specifications from any monitored operating parameter. This checklist is complete.NO We do not report to the commissioner all recorded readings outside of the specification or range of specifications from any monitored operating parameter. This is a deviation and must be reported on the DRF-2 form. This checklist is complete.